work time
1.svn, jira trainning
2.xpc system deployment
3.Get farmilar with the xpc system.
after work
3.to study the using of SQuirreL
4.AppEngine Blog developing.
next day schedule:
1.Enter the QA team
2.study the source code of the xpc system.
(It will cost serveral days to get a general idea of the system. Maybe one week)