CMM LEVEL2 KAP:SCM PROCESS

  1.    Make a procedure of SCM plan for software project.

  • A project software manager designates a CM at the beginning of a software life cycle.
  •   SCM group get a identified for software work products which to be placed under configuration management in project planning time.
  • CM makes a SCM plan protocol after project planning activity.
  • SCM group review and approve the SCM plan in review time.
  • CM goes along edition control of SCM plan in software life cycle.
  • SCM group manage SCM activity of project according to SCM plan in software life cycle.
2.    Make a model of SCM plan for software project.
  • CM makes a SCM plan protocol model after project planning activity.
  •   SCM group review and approve the SCM plan model in review time.
  • CM goes along edition control of SCM plan model in software life cycle.
  •   SCM group make a SCM plan of project according to SCM plan model in software life cycle.
3.    Software Configuration Management process.
  •   SCM group designate principal of SCM plan at the beginning of a software life cycle.
  •   Analyst of SCM make SCM plan at the beginning of a software life cycle.
  • SCM group review and approve the SCM plan in review time.
  • Analyst of SCM assigns system space for SCM library after the beginning of a project.
  • SCM group implement and record activity of SCM after the beginning of a project.
  • SCM group audit SCM plan and release SCM reports on schedule.
  • SCM group do some Measurement for SCM on schedule.
  • SQA approve activity of SCM on schedule.
  • PM approve activity of SCM on schedule.
4.    A procedure of create software baseline.
  • SCCB approve new software baseline after it pass the process of change controlled.
  • SCCB do some Regression Testing after it bring into new software baseline.
  • SCCB release a new software baseline after the Regression Testing.
5.    A procedure of audit software baseline.
  • SCCB add Progress time chart of baseline audit to SCM plan and project plan.
  • SCCB release message about audit of software baseline to SCM group and SEG at the beginning of a project.
  • SCCB check the audit of software baseline according to standard format at the beginning of a project.
  • SCCB check the process of software baseline according to SCM process and standard at the beginning of a project.
  • SCCB release audit reports according to evaluation result at the beginning of a project.
  • SCCB give audit reports to PM at the beginning of a project.
  • SCCB Track measure which is identified in audit in software life cycle.
  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 1
    评论
评论 1
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值