Codeforces Round #433 (Div. 2, C. Planning (贪心+简单实现)

C. Planning
time limit per test
1 second
memory limit per test
512 megabytes
input
standard input
output
standard output

Helen works in Metropolis airport. She is responsible for creating a departure schedule. There are n flights that must depart today, the i-th of them is planned to depart at the i-th minute of the day.

Metropolis airport is the main transport hub of Metropolia, so it is difficult to keep the schedule intact. This is exactly the case today: because of technical issues, no flights were able to depart during the first k minutes of the day, so now the new departure schedule must be created.

All n scheduled flights must now depart at different minutes between (k + 1)-th and (k + n)-th, inclusive. However, it’s not mandatory for the flights to depart in the same order they were initially scheduled to do so — their order in the new schedule can be different. There is only one restriction: no flight is allowed to depart earlier than it was supposed to depart in the initial schedule.

Helen knows that each minute of delay of the i-th flight costs airport ci burles. Help her find the order for flights to depart in the new schedule that minimizes the total cost for the airport.
Input

The first line contains two integers n and k (1 ≤ k ≤ n ≤ 300 000), here n is the number of flights, and k is the number of minutes in the beginning of the day that the flights did not depart.

The second line contains n integers c1, c2, …, cn (1 ≤ ci ≤ 107), here ci is the cost of delaying the i-th flight for one minute.
Output

The first line must contain the minimum possible total cost of delaying the flights.

The second line must contain n different integers t1, t2, …, tn (k + 1 ≤ ti ≤ k + n), here ti is the minute when the i-th flight must depart. If there are several optimal schedules, print any of them.
Example
input

5 2
4 2 1 10 2

output

20
3 6 7 4 5

Note

Let us consider sample test. If Helen just moves all flights 2 minutes later preserving the order, the total cost of delaying the flights would be (3 - 1)·4 + (4 - 2)·2 + (5 - 3)·1 + (6 - 4)·10 + (7 - 5)·2 = 38 burles.

However, the better schedule is shown in the sample answer, its cost is (3 - 1)·4 + (6 - 2)·2 + (7 - 3)·1 + (4 - 4)·10 + (5 - 5)·2 = 20 burles.

题意:

给你n个飞机,k。按出发顺序1-n给你每个飞机拖延1分钟所要给的分数。让你重新排列飞机的飞行表。

前1-k分钟不能起飞。求一个出发顺序,让总分数最少。


原本打算用set的,结果错了。。
看了别人是这样的,非常好。。


int ans[N];
priority_queue<pii>q;
int c[N];
int main(){
    int n,k;sf("%d%d",&n,&k);
    rep(i,1,n){ sf("%d",&c[i]); }
    int tp=1;
    LL tot=0;
    for(int t=k+1;t<=k+n;++t){
        while(tp<=t&&tp<=n){
            q.push(MP(c[tp],tp));
            ++tp;
        }
        pii x=q.top();q.pop();
        ans[x.second]=t;
        tot+=1LL*x.first*(1LL*t-x.second);
    }
    cout<<tot<<'\n';
    rep(i,1,n){
        pf("%d%c",ans[i],i==n?'\n':' ');
    }
}
  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
系统根据B/S,即所谓的电脑浏览器/网络服务器方式,运用Java技术性,挑选MySQL作为后台系统。系统主要包含对客服聊天管理、字典表管理、公告信息管理、金融工具管理、金融工具收藏管理、金融工具银行卡管理、借款管理、理财产品管理、理财产品收藏管理、理财产品银行卡管理、理财银行卡信息管理、银行卡管理、存款管理、银行卡记录管理、取款管理、转账管理、用户管理、员工管理等功能模块。 文中重点介绍了银行管理的专业技术发展背景和发展状况,随后遵照软件传统式研发流程,最先挑选适用思维和语言软件开发平台,依据需求分析报告模块和设计数据库结构,再根据系统功能模块的设计制作系统功能模块图、流程表和E-R图。随后设计架构以及编写代码,并实现系统能模块。最终基本完成系统检测和功能测试。结果显示,该系统能够实现所需要的作用,工作状态没有明显缺陷。 系统登录功能是程序必不可少的功能,在登录页面必填的数据有两项,一项就是账号,另一项数据就是密码,当管理员正确填写并提交这二者数据之后,管理员就可以进入系统后台功能操作区。进入银行卡列表,管理员可以进行查看列表、模糊搜索以及相关维护等操作。用户进入系统可以查看公告和模糊搜索公告信息、也可以进行公告维护操作。理财产品管理页面,管理员可以进行查看列表、模糊搜索以及相关维护等操作。产品类型管理页面,此页面提供给管理员的功能有:新增产品类型,修改产品类型,删除产品类型。
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值