RecapQuiz of Software Engineering Foundation-PartⅠ

Need for a Mature Process

S.NO.

Question

S.NO.

Possible answer

1. 

What is a Software process?

  1.  

The set of activities, methods, and practices used in the production and evolution of software. (SEI CMM (Humphrey, 1989, Paulk et al, 1993)

 

2. 

What is a mature process?

 

A mature process is defined clearly in terms of activities, methods, and practices, such that it can be applied consistently across projects. A mature process has evolving guidelines for continuous improvement.

3. 

What is SEI-CMM?

  1.  

The Software Engineering Institute (SEI) of Carnegie Mellon University has developed a Capability Maturity Model, which describes the principles and practices that should be followed for software process maturity.

 

The CMM model provides a framework for organizations to monitor their process and improve continuously.

 

Analyzing Industry Perspective on SEI-CMMi

S.NO.

Question

S.NO.

Possible answer

4. 

What is ISO 9001-2000?

1. 

The ISO 9000 series of standards is a set of documents dealing with quality systems that can be used for external quality assurance purposes. They specify quality system requirements for use where a contract between two parties requires the demonstration of a supplier's capability to design and supply a product. The two parties could be an external client and a supplier, or both could be internal, for example marketing and engineering groups in a company.

 

5. 

How is ISO different from SEI-CMMi?

2. 

ISO is a quality standard that is applicable to many industries. CMMi is a quality model specific to IT industry.

 

 

Identifying Key Roles

 

Question

 

Possible Answers

1.      

What is the importance of team organisation?

1.        

Organized and structured team is the key to a successful project.

2.      

What are the key roles in a software development factory?

2.        

a.      Commercial Project Manager

b.      Project Manager

c.      Technical Lead/Architect

d.      Team Leader

e.      Team Member/Developer

f.        Quality Assurance/Tester

g.      Quality Reviewer

h.      Configuration Manager

i.         Subject Matter Expert

 

Other roles can also exist depending on the type of project.

 

Project Start-up Activities

 

Question

 

Possible Answers

1.

Explain the different phases of an SDLC?

 

1.        

The different phases of SDLC are:

w        Analysis

·         Determining the business needs and requirements of the system.

w        Design

·         Developing a structure or prototype of the proposed system.

w        Construction

·         Developing the system based on the requirements and design.  

w        Testing

·         Evaluating to ensure that the system complies with the requirements.

w        Implementation

      Execution of the system.

2.

What are project-startup activities?

2.        

Project start-up is a set of activities performed before the initiation of the project. It involves specifying initial requirements, signing contract, and creating project plans.

 

Critical Start-up Documents- RFP and Contract

 

Question

 

Possible Answers

1.

What is an RFP?

 

1.

·                                 RFP is the document send out by the client stating the requirements, scope and terms of the project. The potential service providers or vendors send a bid in response to RFP.

 

2.

What is a Contract?

 

2.

A contract is a written agreement between the client and the service provider or vendor, which defines the scope, commercials considerations, terms, and conditions for mutual responsibilities of the project.

3.

Define:

·          RFI

·          SOW

3.

 

RFI:

An RFI is a preliminary step to an RFP, in which a company solicits a number of potential vendors for information about their products and services.

 

SOW:

The Statement of Work provides the details of the job to be done. It describes the problem as well as the users and the user environment. The overall technical capabilities of the system are described, as well as what is not included.

 

Critical Start-up Documents - Project Plan

 

Question

 

Possible Answers

  2.

What is a Project plan?

2.

A project plan consists of low-level details, critical path activities, bottlenecks and risks analysis as well as resources required by the projects.

 

 

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值