[1] Imran A C. A research survey:review of flexible job shop scheduling techniques[J] . International Transactions in Operational Research, 2016, 23(3):551-591.
[2] 林仁, 周国华, 夏方礼, 等. 人员柔性度对作业车间调度的影响研究[J] . 计算机应用研究, 2016, 33(10):3017-3020, 3025.
[3] Driss I, Mouss K, Laggoun A. A new genetic algorithm for flexible job-shop scheduling problems[J] . Journal of Mechanical Science & Technology, 2015, 29(3):1273-1281.
[4] Allaoui H, Lamouri S, Artiba A, et al. Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan[J] . International Journal of Production Economics, 2008, 112(1):161-167.
[5] Naderi B, Zandieh M, Aminnayeri M. Incorporating periodic preventive maintenance into flexible flow-shop scheduling problems[J] . Applied Soft Computing, 2011, 11(2):2094-2101.
[6] 朱传军, 宋文家, 张超勇, 等. 基于维修时间窗的柔性作业车间调度优化研究[J] . 中国机械工程, 2016, 27(10):1337-1343.
[7] Mokhtari H, Hasani A. An energy-efficient multi-objective optimization for flexible job-shop scheduling problem[J] . Computers & Chemical Engineering, 2017, 104(9):339-352.
[8] Huang Song, Tian Na, Wang Yan, et al. Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization[J] . SpringerPlus, 2016, 5(1):1432.
[9] 彭建刚, 刘明周, 张铭鑫, 等. 多目标柔性作业车间调度算法研究综述[J] . 中国机械工程, 2014, 25(23):3244-3254.
[10] 吴正佳, 何海洋, 黄灿超, 等. 带机器故障的柔性作业车间动态调度[J] . 机械设计与研究, 2015, 31(3):94-98.
[11] Li Junqing, Pan Quanke, Tasgetiren M F. A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities[J] . Applied Mathematical Modelling, 2014, 38(3):1111-1132.
[12] Gao Kaizhou, Suganthan P N, Tasgetiren M F, et al. Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion[J] . Computers & Industrial Engineering, 2015, 90(C):107-117.
[13] 曾强, 沈玲, 任华, 等. 双资源批量生产柔性作业车间多目标调度方法[J] . 计算机工程与应用, 2015, 51(1):250-255.
[14] 张超勇, 刘琼, 邱浩波, 等. 考虑加工成本和时间的柔性作业车间调度问题研究[J] . 机械科学与技术, 2009, 28(8):1005-1011.
[15] 赵宁, 李开典, 田青, 等. 考虑运输时间柔性作业车间调度问题的快速寻优方法[J] . 计算机集成制造系统, 2015, 21(3):724-732.
[16] Wang Chenjie, Kang Ningxuan, Zheng Li. A factory-level dynamic operator allocation policy:the bubble allocation[J] . International Journal of Production Research, 2016, 54(14):4240-4255.
[17] Azadeh A, Ebrahimipour V, Tadayon S. Optimization of operator allocation in a large multi-product assembly shop through unique integration of simulation and genetic algorithm[J] . International Journal of Advanced Manufacturing Technology, 2014, 76(1-4):471-486.
[18] Benavides A J, Ritt M, Miralles C. Flow shop scheduling with hete-rogeneous workers[J] . European Journal of Operational Research, 2014, 237(2):713-720.
[19] Chen Y Y. A hybrid algorithm for allocating tasks, operators, and workstations in multi-manned assembly lines[J] . Journal of Manufacturing Systems, 2017, 42:196-209.
[20] Behnamian J. Scheduling and worker assignment problems on hybrid flow shop with cost-related objective function[J] . International Journal of Advanced Manufacturing Technology, 2014, 74(1-4):267-283.
[21] Park J, Bae H, Dinh T C, et al. Operator allocation in cellular manufacturing systems by integrated genetic algorithm and fuzzy data enve-lopment analysis[J] . International Journal of Advanced Manufacturing Technology, 2014, 75(1-4):465-477.
[22] Azadeh A, Sheikhalishahi M, Koushan M. An integrated fuzzy DEA-Fuzzy simulation approach for optimization of operator allocation with learning effects in multi-products CMS[J] . Applied Mathematical Modelling, 2013, 37(24):9922-9933.
[23] Delgoshaei A, Ali A. An applicable method for scheduling temporary and skilled-workers in dynamic cellular manufacturing systems using hybrid ant colony optimization and tabu search algorithms[J] . Journal of Industrial and Production Engineering, 2017, 34(6):425-449.
[24] Jaber M Y, Neumann W P . Modelling worker fatigue and recovery in dual-resource constrained systems[J] . Computers & Industrial Engineering, 2010, 59(1):75-84.
[25] Lobo B J , Wilson J R, Thoney K A , et al. A practical method for evaluating worker allocations in large-scale dual resource constrained job shops[J] . IIE Transactions, 2014, 46(11):1209-1226.
[26] Givi Z S , Jaber M Y , Neumann W P. Production planning in DRC systems considering worker performance[J] . Computers & Industrial Engineering, 2015, 87:317-327.
[27] 赵诗奎, 方水良, 顾新建. 基于极限调度完工时间最小化的机器选择及FJSP求解[J] . 计算机集成制造系统, 2014, 20(4):854-865.
[28] 张国辉, 张凌杰, 吴立辉, 等. 精英进化策略求解柔性作业车间调度问题[J] . 计算机应用研究, 2016, 33(12):3579-3581.