The BM's work load

   I think the BM's work load is hard now. The build job is really a time killer.
Tuesday, I do a test about multi-shadow with a variant. I do many collateral work for shorten test time.
I tested two variant,
the first variant have a normal shadow, and I manully created another shadow for the variant. then do build and lint check at the same time.(over one hour)
I created two shadows workarea for the second variant. then do build and lint check at the same time.(one ahd half hour).
I skiped over the hard ware test because I haven't the hard ware.
Do contsync for the four variant ( parallel )use 2 hours, build use 3 hours.  So the test use time about  6 hours. That day , I was over time until 10:38 pm. when I left, another test building still running.

If BM only check two variant everyday, use two shadow worarea to shorten build time, he totally need 4  hours.

If we build failed, then we should chek the log, let developers change code. build again. it will use more than 4 hours.perhaps 8 or ?

one day if we only check two variants , may be the build manager can promote a baseline. but if he had to check more variants, and he only have one computer, it is really hard. time is limited.

if we have 6 variant to test.........and if they build failed at first............





转载于:https://www.cnblogs.com/applegirl/archive/2005/03/25/125815.html

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值