2013年3月国计算机等级考试二级C语言笔试试题和答案
be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly
be limited to no more than 2 days of work, materia