rgv调度的matlab程序,具有最小基本动作周期的RGV动态调度策略

Abstract:A dynamic scheduling model of RGV with minimum basic action period is proposed for the two key problems of real-time scheduling and fault scheduling of RGV based on a detailed analysis of the working principle of linear RGV. The RGV scheduling strategy of this model is to let the RGV select the CNC with the minimum basic action cycle time for service in each scheduling. The basic action cycle time of the RGV is the sum of waiting, motion, loading and unloading, and cleaning time for a CNC that processes the first process in a one-step process or a multi-step process without clinker. For a CNC that processes the first process in a two-process process with clinker, the basic action cycle time of the RGV is the sum of wait, motion, loading and unloading, motion, loading and unloading, and cleaning time. The RGV scheduling model is simulated and solved by matlab programming, and the solution results show that this RGV dynamic scheduling strategy can effectively improve the efficiency of the RGV vehicle.

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值