oracle rac v3500_ORACLE RAC 300G内存配置

本文档提供了当Oracle RAC数据库的SGA超过300GB时的最佳实践和建议,包括调整init.ora参数如_lm_sync_timeout、_ksmg_granule_size、shared_pool_size等,并推荐了相关补丁,如11.2.0.3.4 PSU的18167801补丁,强调了在实施前需在测试环境中验证。
摘要由CSDN通过智能技术生成

随着去IOE,其中PC服务器的硬件相对于IBM小机要便宜很多,很多主机都配置上T的内存,下面是MOS中介绍在RAC环境中,大于300G内存以上需要考虑的一些参数情况。

欢迎大家加入ORACLE超级群:17115662 免费解决各种ORACLE问题,以后BLOG将迁移到http://www.htz.pw

Best Practices and Recommendations for RAC databases using SGA larger than 300GB (文档 ID 1619155.1)

In this Document

APPLIES TO:

Oracle Database - Enterprise Edition - Version 10.2.0.1 to 12.1.0.1 [Release 10.2 to 12.1]

Information in this document applies to any platform.

PURPOSE

The goal of this note is to providebest practices and recommendations to users of Oracle Real Application Clusters (RAC) database using a large SGA that is greater than 300GB. This document is compiled and maintained based on Oracle's experience with its global RAC customer base.

This is not meant to replace or supplant the Oracle Documentation set, but rather, it is meant as a supplement to the same. It is imperative that the Oracle Documentation be read, understood, and referenced to provide answers to any questions that may not be clearly addressed by this note.

All recommendations should be carefully reviewed by your own operations group and should only be implemented if the potential gain as measured against the associated risk warrants implementation. Risk assessments can only be made with a detailed knowledge of the system, application, and business environment.

As every customer environment is unique, the success of any Oracle Database implementation, including implementations of Oracle RAC, is predicated on a successful test environment. It is thus imperative that any recommendations from this note are thoroughly tested and validated using a testing environment that is a replica of the target production environment before being implemented in the production environment to ensure that there is no negative impact associated with the recommendations that are made.

SCOPE

This article applies to all new and existing RAC implementations.

DETAILS

init.ora parameters:

a.Set _lm_sync_timeout to 1200

Setting this will prevent some timeouts during reconfiguration and DRM

b.Set _ksmg_granule_size to 134217728

Setting this will cut down the time needed to locate the resource for a data block.

c.Set shared_pool_size to 15% or larger of the total SGA size.

For example, if SGA size is 1 TB, the shared pool size should be at least 150 GB.

d.Set _gc_policy_minimum to 15000

There is no need to set _gc_policy_minimum if DRM is disabled by setting _gc_policy_time = 0

e.Set _lm_tickets to 5000

Default is 1000.   Allocating more tickets (used for sending messages) avoids issues where we ran out of tickets during the reconfiguration.

f.Set gcs_server_processes to the twice the default number of lms processes that are allocated.

The default number of lms processes depends on the number of CPUs/cores that the server has,  so please refer to the gcs_server_processes init.ora parameter section in the Oracle Database Reference Guide for the default number of lms processes for your server.  Please make sure that the total number of lms processes of all databases on the server is less than the total number of CPUs/cores on the server.  Please refer to theDocument 558185.1

Following patches are recommended:

For database on 11.2.0.3.4 PSU,

Patch  18167801- MERGE REQUEST ON TOP OF DATABASE PSU 11.2.0.3.4 FOR BUGS 18110922 16392068

(This merged patch has many fixes that are needed for using large SGA)

For database on 11.2.0.3.5 PSU or above,please contact Oracle Support

Database - RAC/Scalability Community

Still have questions? Use the communities window below to search for similar discussions or start a new discussion on this subject.

Note: Window is theLIVEcommunity not a screenshot.

Clickto open in main browser window.

REFERENCES

NOTE:558185.1- LMS and Real Time Priority in Oracle RAC 10g and 11g

In this Document

APPLIES TO:

Oracle Database - Enterprise Edition - Version 10.2.0.1 to 12.1.0.1 [Release 10.2 to 12.1]

Information in this document applies to any platform.

PURPOSE

The goal of this note is to provide best practices and recommendations to users of Oracle Real Application Clusters (RAC) database using a large SGA that is greater than 300GB. This document is compiled and maintained based on Oracle's experience with its global RAC customer base.

This is not meant to replace or supplant the Oracle Documentation set, but rather, it is meant as a supplement to the same. It is imperative that the Oracle Documentation be read, understood, and referenced to provide answers to any questions that may not be clearly addressed by this note.

All recommendations should be carefully reviewed by your own operations group and should only be implemented if the potential gain as measured against the associated risk warrants implementation. Risk assessments can only be made with a detailed knowledge of the system, application, and business environment.

As every customer environment is unique, the success of any Oracle Database implementation, including implementations of Oracle RAC, is predicated on a successful test environment. It is thus imperative that any recommendations from this note are thoroughly tested and validated using a testing environment that is a replica of the target production environment before being implemented in the production environment to ensure that there is no negative impact associated with the recommendations that are made.

SCOPE

This article applies to all new and existing RAC implementations.

DETAILS

init.ora parameters:

a.  Set _lm_sync_timeout to 1200

Setting this will prevent some timeouts during reconfiguration and DRM

b. Set _ksmg_granule_size to 134217728

Setting this will cut down the time needed to locate the resource for a data block.

c. Set shared_pool_size to 15% or larger of the total SGA size.

For example, if SGA size is 1 TB, the shared pool size should be at least 150 GB.

d. Set _gc_policy_minimum to 15000

There is no need to set _gc_policy_minimum if DRM is disabled by setting _gc_policy_time = 0

e.  Set _lm_tickets to 5000

Default is 1000.   Allocating more tickets (used for sending messages) avoids issues where we ran out of tickets during the reconfiguration.

f. Set gcs_server_processes to the twice the default number of lms processes that are allocated.

The default number of lms processes depends on the number of CPUs/cores that the server has,  so please refer to the gcs_server_processes init.ora parameter section in the Oracle Database Reference Guide for the default number of lms processes for your server.  Please make sure that the total number of lms processes of all databases on the server is less than the total number of CPUs/cores on the server.  Please refer to the Document 558185.1

Following patches are recommended:

For database on 11.2.0.3.4 PSU,

Patch  18167801  - MERGE REQUEST ON TOP OF DATABASE PSU 11.2.0.3.4 FOR BUGS 18110922 16392068

(This merged patch has many fixes that are needed for using large SGA)

For database on 11.2.0.3.5 PSU or above, please contact Oracle Support

Database - RAC/Scalability Community

Still have questions? Use the communities window below to search for similar discussions or start a new discussion on this subject.

Note: Window is the LIVE community not a screenshot.

Click here to open in main browser window.

REFERENCES

NOTE:558185.1 - LMS and Real Time Priority in Oracle RAC 10g and 11g

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值