1. Dev for 1 facility;
2. Push to QA with 2 other facilities; And then let the tester play with it.
3. Push to PROD with 1 facility;
1. Dev for 1 facility;
2. Push to QA with 2 other facilities; And then let the tester play with it.
3. Push to PROD with 1 facility;