Oracle EBS笔记9

Setup Steps

                              设置步骤

For each step, a Context section indicates whether you need to repeat the step for each set of books, set of tasks, inventory organization, HR organization, or other operating unit under Multiple Organizations.

对于每一个步骤,一个上下文部分表示您是否需要为每一组书籍、任务集合、库存组织、HR组织或其他组织中的其他操作单元重复步骤。

Step 1 Set Profile Options (Required)

步骤1 设置配置文件选项(必需)

Profile options specify how Oracle Bills of Material controls access to and processes data. In general, profile options can be set at one or more of the following levels: site, application, responsibility, and user.

配置文件选项指定Oracle的物料清单如何控制访问和处理数据。一般来说,配置文件选项可以设置在以下级别的一个或多个级别:站点、应用程序、职责和用户。

Oracle Bills of Material users use the Update Personal Profile Options form to set profile options only at the user level. System administrators use the Update System Profile Options form to set profile options at the site, application, responsibility, and user levels. See: Oracle Bills of Material Profile Options

Oracle的物料清单用户使用更新个人配置选项,只在用户级别设置概要文件选项。系统管理员使用更新系统配置选项在站点、应用程序、职责和用户级别设置概要选项。参看:Oracle物料清单配置选项。

Context: Perform this step once for each entity, that is, organization operating unit, business group, or legal entity.

环境:为每个实体执行此步骤,即组织操作单元、业务组或法律实体。

See Also: Oracle Bills of Material Profile Options

参见:Oracle 物料清单配置文件选项

Step 2 Define Exception Templates (Optional)

步骤2定义异常模板(可选)

You can define your own exception templates. When you assign an exception template to your workday calendar, you can assign workday exceptions to account for plant workday differences--such as holidays, scheduled maintenance, or extended downtime.

您可以定义自己的异常模板。当您为您的工作日日历分配一个异常模板时,您可以为工厂工作日的差异分配工作异常,例如假期、计划维护或延长的停机时间。

Context: Perform this step once per installation.

环境:每安装一次执行这个步骤。

See Also: Creating a Workday Exception Templates 

参见:创建一个工作日异常模板

Step 3 Define and Build your Workday Calendar (Required)

步骤3定义并构建你的工作日日历(必需)

You define a workday calendar for one or more organizations, and assign an exception set to each calendar. For each workday calendar and exception set, you assign a list of holidays or workday exceptions. You then define shifts for your workday calendar, and assign any shift workday exceptions.

您为一个或多个组织定义工作日日历,并为每个日历分配一个异常设置。对于每个工作日日历和异常设置,您分配假日或工作日异常的列表。然后,为工作日日历定义移位,并分配任何移位工作日异常

After you define your workday calendar information, you build your workday calendar with the exception set. If you associate one calendar with multiple organizations, you can build your workday calendar with multiple exception sets to account for workday differences across organizations.

在定义工作日日历信息之后,您将使用异常设置来构建工作日日历。如果将一个日历与多个组织关联起来,您可以使用多个异常设置构建工作日日历,以解释跨组织的工作日差异。

Attention: If you use Oracle Master Scheduling/MRP, choose the calendar options 445 weekly quarter pattern or 544 weekly quarter pattern if you want to report MRP information in weeks and months. Otherwise, if you choose 13 period calendar or Regular calendar months, you can only report MRP information in monthly buckets.

注意:如果您使用Oracle的主调度/MRP,那么如果您想要在几周或几个月内报告MRP信息,那么可以选择使用日历选项445周1/4或544周1/4模式。否则,如果您选择13期日历或常规日历月,您只能在月桶中报告MRP信息。否则,如果您选择13期日历或常规日历月,您只能在月桶中报告MRP信息。

Context: Perform this step once per installation.

环境:每次安装时执行此步骤

See Also: Creating a Workday Calendar 

参考:创建一个工作日日历

Step 4 Assign Workday Calendar to Organization (Required)

4步将工作日历分配给组织(必需)

You assign a workday calendar and exception set to each of your organizations. You can share the same workday calendar across organizations with either the same or a different exception set for each organization.

您为每个组织分配一个工作日日历和异常集。您可以组织中共享相同的工作日日历,对于每个组织都有相同的或不同的异常集。

Default: If you skip this step, <enter value here> will be used as the default value.

系统默认值如果跳过这一步,将使用 <enter value here>作为默认值。

Context: Perform this step once per organization.

环境:每个组织执行一次此步骤。

See Also: Assigning Workday or Shift Exceptions 

参考:分配工作日或转移异常

Step 5 Define Bill of Material Parameters (Required)

步骤5定义物料清单参数(必需)

You assign the maximum number of bill of material levels for bill explosions, loop checks and implosions. For assemble to order manufacturers, you assign configuration item information.

Oracle Cost Management does require that you assign values to each parameter if you compute an organization's manufacturing costs based on bill of material and routing information defined in Oracle Bills of Material.

You assign the maximum number of bill of material levels for bill explosions, loop checks and implosions.

你为清单的激增、循环检查和implosions分配了物料清单的最高数目。为了组装订单制造商,您需要分配物料信息。Oracle成本管理要求,如果您计算一个组织的制造成本,那么您就需要为每个参数分配值,这些成本是基于在Oracle的物料清单物料清单的工艺路线信息。

Context: Perform this step once per organization.

环境:每个组织执行一次此步骤。

See Also: Defining Bill of Material Parameters 

参考:定义物料清单参数

  • 1
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值