摘 要
本设计的主要任务是河北某给水工程初步设计。设计的主要内容包括:给水方案比较、净水厂设计。设计书由设计资料、设计说明书和设计计算书三部分组成。
本设计的一期设计规模是12.0万m3/d,以水库水为水源。净水厂的设计是指净水厂的位置选择、水处理工艺流程的确定、处理构筑物的设计计算以及水厂的平面和高程布置。水厂出水水质要求达到《生活饮用水卫生规范》(2001)。
水厂位于该区北部,地面标高为14.20m,,绿化面积约占25%,附属面积约占总面积的15%,内设标准化篮球场和排球场,力争创建一个清新怡人的现代化水厂。
关键词
净水工程;机械搅拌澄清池;普通快滤池;清水池,
ABSTRACT
The main task of this design is in fengrunqu in Tangsan City, the preliminary design of the county water supply project. The key elements of design: water supply schemes, water treatment plant design .Water distribution network with the calculation and adjustment. Design information from design documents, design specification and design of the book is composed of three parts calculation.
This design is the size of the recent design of 120,000 m3 / d, for the water to lakewater. The surface water diversion project consists of the selection of water source location, the form of water diversion and the design of pump station. And so does the ground water diversion project.Water plant to meet water quality requirements, "Drinking Water Health Standards" (2001).
Wen County Water Treatment Plant is located in suburban counties, northof the city, the ground elevation is 14.20m , accounting for about 25% green area, sub area of about 15% of the total area, will include the standardization of the basketball court and volleyball court, and strive to create a modern and pleasant fresh water plant.
Keywords
water treatment project; mechanical stirring; high speed filter cell Clearance pond