SE | Software Engineering | 软件工程 |
BURS | Business and User Requirement Specification | 业务和用户需求规格说明 |
CCB | Change Control Board | 变更控制委员会 |
CI | Configuration Item | 配置管理项 |
CR | Change Request | 变更申请 |
CMM | Capability Maturity Model | 软件能力成熟度模型 |
COQ | Cost Of Quality | 质量成本 |
CUT | Coding&Unit Test /Construct | 编码及单元测试 |
DD | Detail Design | 详细设计 |
DP | Defect Prevention ( CMM Level 5 KPA ) | 缺陷预防(CMM第五级的KPA) |
FURPS+ | Functionality, Usability, Reliability, Performance, Supportability, + Localizability, Portability | 功能性,可用性,可靠性,性能,支持性 + 本地化,可移植性 |
HLD | High Level Design | 概要设计 |
IC | (IGC) Intergroup Coordination ( CMM Level 3 KPA ) | 组间协调(CMM第三级的KPA) |
ISM | Integrated Software Management ( CMM Level 3 KPA ) | 集成软件管理(CMM第三级的KPA) |
IT | Integration Test | 集成测试 |
KPA | Key Process Area | 关键过程区域 |
LC | Lifecycle | 生命周期 |
LLD | Low Level Design | 详细设计 |
OOA | Object Oriented Analysis | 面对对象分析 |
OOD | Object Oriented Design | 面向对象设计 |
OPD | Organization Process Definition ( CMM Level 3 KPA ) | 组织过程定义(CMM第三级的KPA) |
OPF | Organization Process Focus ( CMM Level 3 KPA ) | 组织过程焦点(CMM第三级的KPA) |
OSSP | Organization Standard Software Process | 组织标准软件过程 |
PCB | Process Capability Baselines | 过程能力基准 |
PCM | Process Change Management ( CMM Level 5 KPA ) | 过程更改管理(CMM第五级的KPA) |
PDSP | Project's Defined Software Process | 项目定义的软件过程 |
PI | Process Improvement | 过程改进 |
PMR | Project Management Review | 项目管理评审 |
PM | Project Manager | 项目经理 |
PP | Project Planning | 项目策划 |
PR | Peer Reviews ( CMM Level 3 KPA) | 同行评审(CMM第三级的KPA) |
QC | Quality Champion | 项目SQA人员 |
QP | Quality Plan | 质量计划 |
QPM | Quantitative Process Management ( CMM Level 4 KPA ) | 定量过程管理(CMM第四级的KPA) |
RA | Requirement Analysis | 需求分析 |
RCA | Root Cause Analysis | 根本原因分析 |
RFP | Request for Proposal | 提议和请求 |
RM | Requirements Management ( CMM Level 2 KPA ) | 需求管理(CMM第二级的KPA) |
ROI | Return On Investment | 投资收益率 |
SCCB | Software Configuration Control Board | 软件配置控制组 |
SCM | Software Configuration Management ( CMM Level 2 KPA) | 软件配置管理(CMM第二级的KPA) |
SCMP | Software Configuration Management Plan | 软件配置管理计划 |
SDLC | Software Development Life Cycle | 软件开发生命周期 |
SEI | Software Engineering Institute | 软件工程研究所 |
SEPG | Software Engineering Process Group | 软件工程过程组 |
SD | System Design | 系统设计 |
SMR | Senior Management Review | 高级管理评审 |
SPC | Statistical Process Control | 统计过程控制 |
SPE | Software Product Engineering ( CMM Level 3 KPA ) | 软件产品工程(CMM第三级的KPA) |
SPI | Software Process Improvement | 软件过程改进 |
SPP | Software Project Plan ( CMM Level 2 KPA ) | 软件项目策划(CMM第二级的KPA) |
SPTO | Software Project Tracking & Oversight | 软件项目跟踪和监督 |
SQA | Software Quality Assurance ( CMM Level 2 KPA ) | 软件质量保证(CMM第二级的KPA) |
SQM | Software Quality Management | 软件质量管理 |
SRS | System/Software Requirement Specification | 软件需求规格说明 |
SSD | System Sequence Diagram | 系统时序图 |
SSM | Software Subcontract Management ( CMM Level 2 KPA ) | 软件子合同管理(CMM第二级的KPA) |
TCM | Technology Change Management | 技术改革管理 |
TP | Training Plan / Training Program ( CMM Level 3 KPA ) | 培训大纲(CMM第三级的KPA) |
TQM | Total Quality Management | 总质量管理 |
UAT | User Acceptance Test | 用户验收测试 |
UC | Use Case | 用例 |
UCD | Use Case Diagram | 用例图 |
UT | Unit Testing | 单元测试 |
WBS | Work Breakdown Structure | 工作分解结构 |