SAP 查看销售订单时,报了一个错误消息,“项目不符合计划行(程序错误)”

正文部分

在网上找了一下解决方法,中文的没有,只有英文的。

I am getting an error message for 1 sales order. What I have discovered is that table vbep (sch. line) and table vbap (itm data) are inconsistent. 

The order according to vbep has 20 line items, but according to vbap the order only has 1 line item. How can this be fixed? I get the message v1 427 
"Item does not match schedule line (program error)" when I try to process this order and the program exits. 

I found OSS notes 510533, 207875, and 128947 which address this issue (sort of, but not really). I ran report 'sd_consistent_check' and found out 
about the vbep <> vbap inconsistency but can figure out how to reorganize the index for vbap so that the two tables are consistent.... 
 

我只能看明白表vbep和表vbap不同,所以报错,但是没有具体的解决方法,请教高手指点一下!

 

有谁知道或者看过NOTE,知道解决方案的,还请赐教。

点击进入:SAP 查看销售订单时,报了一个错误消息,“项目不符合计划行(程序错误)”

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值