HIT 2020Spring Software Construction 0310

Traditional Software Process

In the tradition software process, documents are highlight in every part of the construction and each phase will be test strictly. Considering that users have little interest in documents, the interaction between developers and users is limited.
In existing models we have Waterfall ; Incremental ; V-model ; Prototyping ; Spiral ;

Agile Development

Product is the center of agile development which requires rapid iterative process. It focus on the software itself instead of documents and encourages customer collaboration.
In existing model we have eXtreme Programming.

Software Configuration Management and Version Control System

In this part, we should realize that data and documents are also in the range of SCM and VCS other than codes.

Git

It requires attention that staging area does not exist for real on our disk. There is a file notation to manifest whether a file is in the staging area.
The time consumed to make a new branch has nothing to do with the number of branches.
We should understand the mechanism of the Git.
The basic mechanism of the Git
The branch mechanism of the Git
The comprehensive instruction over the Git operation
It is only a post for what I want to record for the specific course and it does not stand for the whole content.

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值