Set Project Assignment of Requests as Mandatory

Set Project Assignment of Requests as Mandatory

Use

For each system where you want transport requests to be created, you have to set the project assignment of requests as mandatory.

Note that if you set the project assignment of requests as mandatory, you cannot release transport requests without projects. In a transition period during which projects are set up, it may be necessary to create dummy projects so that developments that were made prior to the availability of Change Request Management can still be transported.

Requirements

At least one project has been activated for Change Request Management in transaction SOLAR_PROJECT_ADMIN.

If this is not yet the case, perform. this IMG activity at a later stage.

Activities

  1. 1. Call transaction /TMWFLOW/CMSCONF.
  1. 2. Check the entries in the
Proj. Assignment column.
  1. 3. If you need to change an entry for a system, double-click the entry.

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/47406/viewspace-720313/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/47406/viewspace-720313/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值