BOM 中的虚拟件

BOM 的user guide 的解释如下:

今天在查看一个报表,关于工单的成本与BOM物料需求成本差异比较的时候发现一个物料差异很大。
经过检查发现该BOM中有一个虚拟件,该虚拟件展开后的子件数量比较大。
而该工令上没有虚拟件,只有子件。-----报表异常的原因:展开的子件没有发料

测试发现,BOM中有虚拟件,虚拟件还有BOM的话,
开立工令的时候,系统会自动展开虚拟件最底层的物料作为物料需求,而不会有虚拟件作为物料需求。
查看了一下BOM userguide,中对虚拟件的解释如下
A phantom assembly is a non-stocked assembly that lets you group together material
needed to produce a subassembly. When you create a bill of material for a parent
item, you can specify whether a component is a phantom. One bill of material can
represent a phantom subassembly for one parent item, and a stocked subassembly for
another parent item.
Oracle Work in Process explodes through a phantom subassembly to the components
as if the components were tied directly to the parent assembly. You can define routing
for phantoms assemblies the same way as other assemblies. Work in Process ignores
phantom assembly routings when you define a job or repetitive schedule.
You can compute manufacturing and cumulative lead times for phantom assemblies that
have routings. If you do not want to offset the components of a phantom assembly in the
planning process, exclude the phantom item from the lead time calculations.
In general, phantom assemblies behave like normal assemblies when they represent a
top level assembly, such as when you master schedule them or manufacture them using
a discrete job. As a subassembly, however, they lose their identity as distinct assemblies
and are a collection of their components. The components of the phantom subassembly
are included on the job and on the pick list of the job-not the phantom itself.
Oracle Master Scheduling/MRP plans the phantom subassembly using the lot-for-lot
lot-sizing technique. Otherwise, the same rules apply to phantoms as for other
assemblies. Set the lead time of a phantom to zero to avoid lead time offset during the
planning process.
When model or option class bills are components to another bill of material, the
component supply type is phantom. See: Two-Level Master Scheduling, Oracle Master
Scheduling/MRP and Oracle Supply Chain Planning User's Guide.
The cost rollup treats phantom assemblies the same as regular assemblies. The phantom
is treated as a distinct entity; the cost elements of the phantom (material, resource, and
so on) are added to the cost elements of the higher assembly. Also, the full cost rollup
process sets the pending phantom assembly burden to 0.

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/29686022/viewspace-1611059/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/29686022/viewspace-1611059/

  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值