ASAP Roadmap(zt)

The ASAP Roadmap provides the methodology for implementing and continuously optimizing your SAP System. It divides the implementation process into five phases and offers detailed Project Plans to assist you (in Microsoft Project format). The documentation stored at each level of the Roadmap tree structure contains recommendations on implementing your SAP System and links to helpful tools and accelerators.

[@more@]

ASAP Roadmap(ZT)

http://help.sap.com/saphelp_47x200/helpdata/en/48/623972d55a11d2bbf700105a5e5b3c/content.htm

Entering content frame

The ASAP Roadmap provides the methodology for implementing and continuously optimizing your SAP System. It divides the implementation process into five phases and offers detailed Project Plans to assist you (in Microsoft Project format). The documentation stored at each level of the Roadmap tree structure contains recommendations on implementing your SAP System and links to helpful tools and accelerators.

Purpose

When you install the Implementation Assistant you can choose from several Roadmap types and flavors.

Implementation Assistant also helps you to implement a combination of software implementation projects.

Features

The implementation of your SAP System covers the following phases:

1.Project Preparation

Define your project goals and objectives Clarify the scope of your implementation Define your project schedule, budget plan, and implementation sequence Establish the project organization and relevant committees and assign resources

2.Business Blueprint

3.Realization

In this phase, you configure the requirements contained in the Business Blueprint. Baseline configuration (major scope) is followed by final configuration (remaining scope), which can consist of up to four cycles. Other key focal areas of this phase are conducting integration tests and drawing up end user documentation.

4.Final Preparation
In this phase you complete your preparations, including testing, end user training, system management, and cutover activities. You also need to resolve all open issues in this phase. At this stage you need to ensure that all the prerequisites for your system to go live have been fulfilled.

5.Go Live & Support

In this phase you move from a pre-production environment to the live system. The most important elements include setting up production support, monitoring system transactions, and optimizing overall system performance.

After your system has gone live, you can use a separate Roadmap with six work packages, in order to optimize your SAP System continuously.

These phases are the main milestones for your SAP System implementation project. Each phase has:

Work packagesActivities, which consist of tasks, which are processed by one or more team members. Tasks, which are carried out by a project team member. You can also access the How-to sections and accelerators at this level., which consist of activities, for which project teams are responsible.


In this phase you create a blueprint using the
In this phase you plan your project and lay the foundations for successful implementation. It is at this stage that you make the strategic decisions crucial to your project: Question & Answer database (Q&Adb) , which documents your enterprise’s requirements and establishes how your business processes and organizational structure are to be represented in the SAP System. You also refine the original project goals and objectives and revise the overall project schedule in this phase.

Roadmap types

Roadmap flavors

Implementation

R/3 System (Continuous Improvement)

BW

APO

Business-to-Business Procurement

Global ASAP

R/3 System

Upgrade

R/3 System

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/9826/viewspace-1020942/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/9826/viewspace-1020942/

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值