CO

CO-CCA Maintain Controlling Area/Activate components/Assignment of company code OKKP
 Maintain number range for CO Document KANK
 Maintain Versions/Controlling area settings/Settings by fiscal year: Overview (SPRO)
 Change Message Control OBA5
 Automatic Creation of Primary and Secondary Cost Elements 
 Make default settings OKB2
 Create Batch Input Session OKB3
 Excute Batch Input Session SM35
 Specify Document Number Range for Reconciliation OK13
 Define Number ranges for Funds Commitment OK60
 Create Cost Center Standard Hierarchy OKEON
 Define cost center catergories SPRO
 Create Profit Center (Do 0KE5 first) KE51
 Create Cost Center KS01
 Create planning layouts for cost element planning KP65
 Define user-defined planner profiles/ Layouts for Controlling 
 Edit Default Account Assignment OKB9
 Define Own Screen Variants For Postings in Controlling 
  
Internal Order Define Budget Profile OKOB
 Define Order Types KOT2_OPA
 Define tolerance limits for availability control SPRO
 Maintain Field Status Variant SPRO
  
CO-PC Define Origin Group OKZ1
 Define Cost Component Structure OKTZ
 1. Cost Component With Attribute OKTZ
 2. Assignment Cost Component -Cost Element Interval OKTZ
 3. Cost component view OKTZ
 4. Assignment Organization Units- Cost Component Structure OKTZ
 Define Costing Types OKKN
 Define Valuation Variants OKKI
 Define Date Control OKK4
 Define Quantity Structure Control OKK6
 Define Costing Variants OKK5
  
 Check Material Status OMS2
 Basic Settings for Product Cost by Order 
 1.Check Costing Variants for Manufacturing Orders (PP) OPL1
 2.Check Valuation Variants for Manufacturing Orders (PP) OPN2
 3.Check Costing Variants for CO production Orders (PP) OKY2
 4.Check Valuation Variants for Manufacturing Orders (PP) OKY5
 5.Check Order Type KOT2
 6.Define Cost-Accounting-Relevant Default Values for Order Types and Plants 
 Defined Goods Valuation for Order Delivery 
 Period-End Closing 
 Work In Process 
 1.Define Results Analysis Keys OKG1
 2.Define Costs Elements for WIP calculation KA06
 3.Define Results Analysis Versions OKG9
 4.Define Valuation Method (Actual Costs)  OKGC
 5.Define Line IDs 
 6.Define Assignment OKGB
 7.Define Update OKGA
 8.Define Posting Rules for Settling Work in Process OKG8
 9.Define Number Ranges for Work in Process OKG6
 Variance calculation 
 1.Define Variance Key OKV1
 2.Define Default Variance Keys for plants. OKVW
 3.Check Variance Variants OKVG
 4.Define Valuation Variant for WIP and Scrap (Target costs) 
 5.Define Target Cost Versions OKV6
 6.Define Number Ranges for Variance Documents KANK

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/14397246/viewspace-666255/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/14397246/viewspace-666255/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值