constructing trails with crushed volcanic tuff) asian crawdad crush video

Comparing with traditional crushing equipment,Pebble crusher has much more lower investment, pebble crusher reduces the cost by 35%-50%.The output size of pebble crusher is fine,and even granularity,the quick wearing parts has long service life.the crushing capacity is higher than the other crusher by half.Pebble crusher makes the three satges crushing process into two stages,which greatly reduces the production cost.Take the limestone crushing plant for example,pebble crusher can do primary crush material below 5mm account for 85%.value of crushing strength of balls in ball mill and value of brokening strength of balls in ball mi
Pebble crusher is extensively applied in the fields of aggregate,cement,refractory,metallurgy and chemical etc.On basis of practical crushing palnt and clients' feedback,Crusher Shanghai Changlei engineers analysis the features of pebble crusher in the following .value of crushing strength of balls in ball mill and value of brokening strength of balls in ball mi 1,High crushing ratio,applies in fine and coarse crushing process
2,Simplified structure,convenient to install and maintain,low crushing cost
3,Little effect by water moisture, the water containing up to 8%
4,High Product packing density, low iron contamination,cubic grain shapevalue of crushing strength of balls in ball mill and value of brokening strength of balls in ball mi
Crusher Shanghai Changlei heavy industry is the worldwide professional roll crusher in China, Our series stone crusher has roll crusher, cone crusher,jaw crusher,impact crusher,VSI sand making Shanghai Changleihine and hammer crusher etc.Crusher Shanghai Changlei roll crusher features of high crushing capacity ,crush manufacturers in france and broken manufacturer in france
 low energy consumption,advanced technique and excellent performance. Roll crusher gains most popular mining Shanghai Changleihinery manufacturer for Crusher Shanghai Changlei heavy industry through perfect clients' feedback and sound after-sale service.crush manufacturers in france and broken manufacturer in france
How to properly operate roll crusher in daily crushing process?What is the operation announcement of roll crusher?Crusher Shanghai Changlei heavy industry experts conclude some tips in the following:crush manufacturers in france and broken manufacturer in france
1,Strengthen  the removal iron work when feed ore.Install iron separating device before the roll crusher,so as to reduce the caused accident 
2,Enforce the check of roll crusher,fill lubricants to roll crusher components at regular interval,keep roll crusher in good working condition.
3,After run a long time of roll crusher,pay attention to adjust the port of discharge or overhaul of equipment,crush manufacturers in france and broken manufacturer in france as a result of serious abrasion on roll surface leads to the product size too small.crush manufacturers in france and broken manufacturer in france

more related articals:
http://www.china-rockcrusher.com/
http://www.quarrycrusherseller.com/
http://www.artificial-sand-maker.com/
http://www.artificialsandprice.com/
http://www.chinacrushermill.net/
http://www.quartzitecrusher.com/
http://crusher.quarrycrusherseller.com/
http://aggregate.quarrycrusherseller.com/
http://grinding.quarrycrusherseller.com/

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/30102624/viewspace-1407779/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/30102624/viewspace-1407779/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
Sure, here's the code: ```cpp #include <iostream> #include <vector> #include <algorithm> using namespace std; void heapify(vector<int>& arr, int n, int i) { int largest = i; int l = 2 * i + 1; int r = 2 * i + 2; if (l < n && arr[l] > arr[largest]) largest = l; if (r < n && arr[r] > arr[largest]) largest = r; if (largest != i) { swap(arr[i], arr[largest]); heapify(arr, n, largest); } } void buildHeap(vector<int>& arr) { int n = arr.size(); for (int i = n / 2 - 1; i >= 0; i--) heapify(arr, n, i); } void printHeap(vector<int>& arr) { int n = arr.size(); int row = 1, col = 0; while (col < n) { for (int i = col; i < min(n, col + row); i++) cout << arr[i] << " "; cout << endl; col += row; row *= 2; } } int main() { vector<int> arr = { 4, 10, 3, 5, 1 }; buildHeap(arr); printHeap(arr); } ``` This program first constructs a max heap from a given vector of integers using the `buildHeap` function. It then prints the heap in a rotated format using the `printHeap` function. The `heapify` function is used to maintain the heap property while constructing the heap. It takes an array `arr`, its size `n`, and the index of the current node `i` as input. It compares the value at the current node with its left and right child nodes, and swaps the current node with the largest child node if necessary. It then recursively calls itself on the largest child node to maintain the heap property. The `buildHeap` function iterates over the second half of the array in reverse order (since these nodes are the ones with children) and calls `heapify` on each node to construct the heap. The `printHeap` function prints the heap in a rotated format. It first initializes the row and column numbers, and then iterates over each row of the heap, printing the nodes in that row and updating the column and row numbers accordingly. Note that this program assumes a complete binary tree representation of the heap. If the input vector is not complete, the program may produce unexpected results.

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值