Profit Center Determination

The Systematics of Profit Center Determination 

This section is intended as a theoretical supplement to the more practical explanation of profit center determination (see Data Origin).

It will explain:

  • the order in which the system proceeds when assigning value flows arising in business processes to various profit centers
which objects and characteristics of objects are decisive for determining the profit center

Transaction Data

Step 1: Document-dependent profit center determination

To begin with, the system determines a profit center on the basis of the origin of the document and any special conditions. It does so by one of the following methods:

  • The system assigns the profit center dynamically, on the basis of certain characteristics in the document itself. When this method is used, the currently assigned profit center is always determined.
  • The system assigns the profit center indirectly, on the basis of certain characteristics in a preceding document. When this method is used, the system does not take into account any assignment changes occurring after the date of the preceding document.

beispiel.gifExample: indirect assignment

When you make a goods receipt posting in Profit Center Accounting, the system takes over the profit center from the corresponding order. In the order, the system finds the profit center which is assigned to the material/plant combination it contained on the order document date.

It could be that another profit center has been assigned to this material/plant combination in the period between the order document date and the goods receipt posting document date. If so, when you make the goods receipt posting, the system still takes over the profit center which was assigned on the order document date.

For detailed illustrations of the criteria used to determine the profit center for each different type of document, see:

MM-Goods Movement

SD Billing Document

FI Posting and FI-AA Asset Posting

MM Goods Receipt Posting

Step 2: Characteristic-dependent profit center determination

With all types of document, the system checks whether one of the following cases applies: The profit center assignment which may arise from this step always has priority over the assignment determined in step 1 on the basis of document type.

In the order shown below, the system checks whether:

If so, ...

1) ..substitutions have been set for profit centers in FI or CO.

...the profit center determined using the substitutions is always used.

For further information on substitutions, see Substitutions.

2) ...the data to be transferred is a cost or revenue element.

the profit center will always be determined from the real (not statistical) assigned CO object belonging to it.

For further information on the assignment of profit centers to CO objects see Profit Center Assignments.

3) ...the data is from balance sheet or profit and loss accounts which have been set for transfer to Profit Center Accounting

and

no profit center has been set in the corresponding document

the system takes the profit center directly assigned to the corresponding accounts (see Customizing for Profit Center Accounting, transaction 3KEH)

or

which was assigned to the corresponding accounts by a derivation rule (see Customizing for Profit Center Accounting, transaction 3KEI)

4) ...the data is from profit and loss accounts which affect logistical processes (that is, data which is taken over as standard)

and

no profit center has been set in the corresponding document

...the data is posted to the dummy profit center.

5) ...you have changed the Profit Center field for the corresponding original document, using the SAP customer enhancement PCA00001.

...the data is posted to the profit center you require.

For more information about using SAP customer enhancements, see the Implementation Guide (IMG) for Profit Center Accounting, under Tools.

 

Balance Sheet Items

When you transfer balance sheet items to Profit Center Accounting, the profit center is determined as follows:

  • For existing payables and receivables, the system reads the profit center from the offsetting lines of the invoices which were posted (FI documents). This is only possible, however, if you have already apportioned payables and receivables during the course of month-end closing in Financial Accounting.
  • For material stocks, the profit center is derived from the material/plant combination. If the stock in question is a sales order stock or a project stock, this is determined by the sales order item or the WBS element.
  • For asset balances, the profit center is determined from the overhead cost order or from the cost center in the asset master record.
  • For work in process, the profit center is derived from the production order or the WBS element.
  • You can also use customer enhancement PCA00001 to assign the profit center you require when transferring balance sheet items.

For more information, see Balance Sheet Items in Profit Center Accounting.

 

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/11782589/viewspace-716975/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/11782589/viewspace-716975/

Python网络爬虫与推荐算法新闻推荐平台:网络爬虫:通过Python实现新浪新闻的爬取,可爬取新闻页面上的标题、文本、图片、视频链接(保留排版) 推荐算法:权重衰减+标签推荐+区域推荐+热点推荐.zip项目工程资源经过严格测试可直接运行成功且功能正常的情况才上传,可轻松复刻,拿到资料包后可轻松复现出一样的项目,本人系统开发经验充足(全领域),有任何使用问题欢迎随时与我联系,我会及时为您解惑,提供帮助。 【资源内容】:包含完整源码+工程文件+说明(如有)等。答辩评审平均分达到96分,放心下载使用!可轻松复现,设计报告也可借鉴此项目,该资源内项目代码都经过测试运行成功,功能ok的情况下才上传的。 【提供帮助】:有任何使用问题欢迎随时与我联系,我会及时解答解惑,提供帮助 【附带帮助】:若还需要相关开发工具、学习资料等,我会提供帮助,提供资料,鼓励学习进步 【项目价值】:可用在相关项目设计中,皆可应用在项目、毕业设计、课程设计、期末/期中/大作业、工程实训、大创等学科竞赛比赛、初期项目立项、学习/练手等方面,可借鉴此优质项目实现复刻,设计报告也可借鉴此项目,也可基于此项目来扩展开发出更多功能 下载后请首先打开README文件(如有),项目工程可直接复现复刻,如果基础还行,也可在此程序基础上进行修改,以实现其它功能。供开源学习/技术交流/学习参考,勿用于商业用途。质量优质,放心下载使用。
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值