20.You have set Tablespace Full Metrics Threshold values for the USERS tablespace as follows:
Warning (%): 90
Critical (%): 95
Which background process is responsible for issuing alerts when the threshold is crossed?
A.System monitor (SMON)
B.Process monitor (PMON)
C.Memory manager process (MMAN)
D.Manageability Monitor process (MMON)
答案:D
解析:
Manageability Monitor Processes (MMON and MMNL)
The manageability monitor process (MMON) performs many tasks related to the Automatic Workload Repository (AWR).
For example, MMON writes when a metric violates its threshold value, taking snapshots, and capturing statistics value for recently modified SQL objects.
参考:http://docs.oracle.com/cd/E11882_01/server.112/e40540/process.htm#CNCPT9841
Warning (%): 90
Critical (%): 95
Which background process is responsible for issuing alerts when the threshold is crossed?
A.System monitor (SMON)
B.Process monitor (PMON)
C.Memory manager process (MMAN)
D.Manageability Monitor process (MMON)
答案:D
解析:
Manageability Monitor Processes (MMON and MMNL)
The manageability monitor process (MMON) performs many tasks related to the Automatic Workload Repository (AWR).
For example, MMON writes when a metric violates its threshold value, taking snapshots, and capturing statistics value for recently modified SQL objects.
参考:http://docs.oracle.com/cd/E11882_01/server.112/e40540/process.htm#CNCPT9841