You notice that the elapsed time for an important database scheduler Job is unacceptably long. The job belongs to a scheduler job class and runs in a scheduler window.
Which two actions could reduce the job's elapsed time?
A. increasing the priority of the job class to which the job belongs
B. increasing the job's relative priority within the job class to which it belongs
C. increasing resource allocation for the consumer group mapped to the job class in the resource manager plan associated with the scheduler window
D. moving the job to an existing higher priority scheduler window with the same schedule and duration
E. increasing the value of the JOB_QUEUE_PROCESSES parameter
F. increasing the priority of the scheduler window to which the job belongs
Correct Answer: BC
您注意到,一个重要的数据库调度器作业的运行时间长得不可接受。该作业属于调度器作业类,并在调度器窗口中运行。
哪两个操作可以减少作业的运行时间?
A增加作业所属的作业类别的优先级
B增加作业在其所属作业类中的相对优先级
C增加与调度器窗口相关联的资源管理器计划中映射到作业类的使用者组的资源分配
D将作业移动到具有相同时间表和持续时间的现有高优先级调度程序窗口
E.增加JOB_QUEUE_PROCESSES参数的值
F.增加作业所属调度器窗口的优先级
正确答案:公元前
http://www.dba-oracle.com/job_scheduling/job_classes.htmhttp://docs.oracle.com/database/121/ADMIN/
schedover.htm#i1106396