How Do Story Points Relate to Hours?

I'm often asked about the relationship between story points and hours. People who ask are usually looking for me to say something like “one story point = 8.3 hours.” Well, that just isn't the case (especially since I made up 8.3 hours). Let's see what the real relationship is between the agile point system vs. hours system. Suppose for some reason you have tracked how long every one-story-point story took to develop for a given team. If you graphed that data you would have something that would look like this:

Number of hours to develop various one-point stories

This shows that some stories took more time than others and some stories took less time, but overall the amount of time spent on your one-point stories takes on the shape of the familiar normal distribution.

Now suppose you had also tracked the amount of time spent on two-point user stories. Graphing that data as well, we would see something like this:

Number of hours to develop various one- and two-point stories

If the one-point stories are centered around a mean of x, ideally the two-point stories will be centered around a mean of 2x. This will never be exactly the case, of course, but a team that does a good job of estimating will be sufficiently close for reliable plans to be made from their estimates. What these two figures show us is that is the relationship between points and hours is a distribution. One point equals a distribution with a mean of x and some standard deviation. The same is true, of course, for two-point stories, and so on… By the way, notice that I've drawn the distributions of one- and two-point stories as having overlapping tails. It should be totally realistic that the biggest story that a team put “one story point” on might turn out to take more time than the smallest story they put a two on. After all, no team can estimate with perfect insight, especially at the story point level. So, while the tails of the one- and two-point distributions will overlap, it would be extraordinarily unlikely that the tails of, say, the one- and thirteen-point distributions will overlap.

原文:How Do Story Points Relate to Hours?

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值