Sprint Log 1(12.06)
https://bbs.csdn.net/topics/611173125
Workload completed | Remaining workload | Rercentage of completed workload |
---|---|---|
The front-end design is basically completed | Client, predictive model , a small front end ,Back end | 10% |
Sprint Log 2(12.08)
https://bbs.csdn.net/topics/611172735
Workload completed | Remaining workload | Rercentage of completed workload |
---|---|---|
Some functional implementation | Client, predictive model,Back end | 20% |
Sprint Log 3(12.10)
https://bbs.csdn.net/topics/611173125
Workload completed | Remaining workload | Rercentage of completed workload |
---|---|---|
The basic function of the database has been basically improved | Client, predictive model,a small Back end | 40% |
Sprint Log 4(12.12)
https://bbs.csdn.net/topics/611211084
Workload completed | Remaining workload | Rercentage of completed workload |
---|---|---|
The back-end development is basically complete. | Client, predictive model | 70% |
Sprint Log 5(12.14)
https://bbs.csdn.net/topics/611211627
Workload completed | Remaining workload | Rercentage of completed workload |
---|---|---|
Test | Client | 80% |