1. suppose we are at the i-th step of the continuous process and the i-th solution is ...(假设。。。)
2. For this simulation, load data from March 31st were sourced from CAISO OASIS [10], and scaled such that their peak
value matched the demand values given in the original singletimestep OPF problem. (比例缩放)