Dynamics AX 2009: Preparing Role Center Deployment BACKGROUND

转载:http://blogs.msdn.com/saveenr/archive/2008/12/03/dynamics-ax-2009-preparing-youself-for-role-centers.aspx

Dynamics AX 2009: Preparing Role Center Deployment

BACKGROUND

Dynamics AX 2009 is a huge project and when I describe the value it delivers I always make sure I mention that to achieve that full value, a customer should be using Role Centers.

And just for reference here is one of the Role Centers - the CEO Role Center.

image

 

You can learn more about Role Centers in this post: Compelling Analytics: SQL Server Reporting Services in Dynamics AX 2009

We are so passionate about the place Role Centers have in AX that I take great pains in my writing and speech to never even imply that that they are optional components - in others words, I want you to think about them as pieces critical to the value of the product. And let me assure you their importance only grows in future releases.

 

WHAT YOU ARE TELLING US

Feedback from customers and partners has been clear

  • They like the idea and the vision
  • Wow, it is hard to deploy.

WE ARE LISTENING AND RESPONDING

So, in our zeal to drive customers to adopt Role Centers, we haven't been crisp in the guidance on how to deploy Role Centers or how to plan for them.

We are addressing that now, and this blog post is the first component of the things we are doing to help you.

 

HERE'S WHAT WE WANT YOU TO KNOW

  • A successful deployment of Role Centers takes planning and preparation - a methodical step-by-step approach - it is not a "flip a switch" and Role Centers do exactly what you want.
  • Although role centers are critical to deliver the product's full value, please do realize that you can upgrade to AX 2009  and take advantage of all other benefits and delay role center deployment until you have fully planned and prepared for it.
  • We are working on making this overall process clear

A SKELETON OF AN OVERALL PROCESS

  • First, get a basic AX 2009 installation working without role centers
    • While you have AX 2009 running, plan in parallel for the role centers: Which roles are needed? what do you need in each role center?
  • Second, roll out the technologies Role Centers need
    • SQL Reporting Services (SSRS)
    • SQL Analysis Services (SSAS)
    • IIS
    • SharePoint
  • Third, deploy and configure the Role Centers
    • Deploy the AX Enterprise Portal
    • Configure the all the technologies needed for role centers: SSAS and SSRS
      • For AX2009 the most complex part will be the SSAS work (we will be creating materials to help guide you through this)
      • The key things that you'll need to think about and configure appropriately here
        • 1 - handling multi-box topologies (for example: if SSRS and SSAS are on different boxes)
        • 2 - securing the AX OLAP Cubes
        • 3 - configuring the AX OLAP Cubes and Role Center web parts to correspond to your specific set of License Keys and Config Keys
  • Fourth, production deployment
    • Finally roll out the AX 2009 Role Centers in production
    • At this point all the core pieces are in place and role center deployment will be much more straightforward than if you had tried to deploy role centers at the very beginning of AX 2009 deployment 

 

 

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值