There is a big problem in the RavenDB build process. To be rather more exact, there is a… long problem in the RavenDB build process.

image

As you can imagine, when the build process run for that long, it doesn’t' get run too often. We already had several runs of “let us optimize the build”. But… the actual reason for the tests taking this long is a bit sneaky.

image

To save you from having to do the math, this means an average of 1.15 seconds per test.

In most tests, we actually have to create a RavenDB instance. That doesn’t take too long, but it does take some time. And we have a lot of tests that uses the network, because we need to test how RavenDB works on the wire.

From that perspective, it means that we don’t seem to have any real options. Even if we cut the average cost of running the tests by half, it would still be a 30 minutes build process.

Instead, we are going to create a layered approach. We are going to freeze all of our existing tests, move them to an Integration Tests project. We will create a small suite of tests that cover just core stuff with RavenDB, and use that. Over time, we will be adding tests to the new test project. When that becomes too slow, we will have another migration.

What about the integration tests? Well, those will be run solely by our build server, and we will setup things so we can automatically test when running from our own forks, not the main code line.

 

原文转载于:http://www.tuicool.com/articles/b6NZju

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值