Gridcontrol升级实录

安装完Gridcontrol 10.2.0.3后,硬盘灯狂闪不止!I/O等待严重,CPU负载很高,这个估计应该是10.2.0.3的bug,所以升级下了gc,升级到10.2.0.5后;负载自然就下来了!升级包可以在oracle官方网站上下载,解压下载下来的GridControl_10205_part1of2.zip和GridControl_10205_part2of2.zip两个文件,解压后会出现一个p3731593_10205_LINUX.zip压缩包,该压缩包为Grid Control 10.2.0.5的补丁包, 包括资料库/OMS/Agent的补丁文件,将其解压后,进入3731593/Disk1目录下,运行runInstaller即可开始升级过程。

升级完的结果如下:

OMS:

 
 
  1. [oracle@gc ~]$ /u01/app/oracle/product/10.2.0.3/oms10g/bin/emctl status oms  
  2. Oracle Enterprise Manager 10g Release 5 Grid Control    
  3. Copyright (c) 1996, 2009 Oracle Corporation.  All rights reserved.  
  4. Oracle Management Server is Up. 

Agent:

 
 
  1. [oracle@gc ~]$ /u01/app/oracle/product/10.2.0.3/agent10g/bin/emctl status agent  
  2. Oracle Enterprise Manager 10g Release 5 Grid Control 10.2.0.5.0.    
  3. Copyright (c) 1996, 2009 Oracle Corporation.  All rights reserved.  
  4. ---------------------------------------------------------------  
  5. Agent Version     : 10.2.0.5.0  
  6. OMS Version       : 10.2.0.5.0  
  7. Protocol Version  : 10.2.0.5.0  
  8. Agent Home        : /u01/app/oracle/product/10.2.0.3/agent10g  
  9. Agent binaries    : /u01/app/oracle/product/10.2.0.3/agent10g  
  10. Agent Process ID  : 5101  
  11. Parent Process ID : 5085  
  12. Agent URL         : https://gc.yang.com:3872/emd/main/  
  13. Repository URL    : https://gc.yang.com:1159/em/upload  
  14. Started at        : 2011-10-02 18:33:52  
  15. Started by user   : oracle  
  16. Last Reload       : 2011-10-02 18:34:08  
  17. Last successful upload                       : 2011-10-02 18:35:52  
  18. Total Megabytes of XML files uploaded so far :    11.64  
  19. Number of XML files pending upload           :      116  
  20. Size of XML files pending upload(MB)         :     4.39  
  21. Available disk space on upload filesystem    :     8.40%  
  22. Last successful heartbeat to OMS             : 2011-10-02 18:35:57  
  23. ---------------------------------------------------------------  
  24. Agent is Running and Ready 


一:升级OMS
[oracle@gc Disk1]$ export ORACLE_HOME=/u01/app/oracle/product/10.2.0.3/oms10g/
[oracle@gc Disk1]$ ./runInstaller

 

 

报错如下,需要使用sysman用户执行命令:exec emd_maintenance.remove_em_dbms_jobs停止正在运行的任务,然后提交,确保以下的sql语句执行结果返回空值!

 
 
  1. SQL>  select count(*) from dba_jobs_running a, gv$session b  
  2.   2   where a.sid=b.sid  
  3.   3*  and b.schemaname='SYSMAN' 
  4.  
  5.   COUNT(*)  
  6. ----------  
  7.          0 

 

 

 

 

 

 

 

二:升级Agent

[oracle@gc Disk1]$ export ORACLE_HOME=/u01/app/oracle/product/10.2.0.3/agent10g/
[oracle@gc Disk1]$ ./runInstaller

 

 

 

 

 

升级的agent_download

升级完OMS和Agent后,同时开启gc和五台虚拟机,其中一台为win7,一台gc,其他三台分别为dg主库,dg物理备库,dg逻辑备库!系统负载如下:

 

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值