Briefing
Good morning, colleagues.
- Today’s briefing consists of two parts: a report on last Friday’s work and the plan for today.
Last Friday, my main focus was on restructuring the permit list.
- This involved updating breadcrumbs, page titles, list headers, and the text and order within the list, according to the latest design specifications.
- This was a slight deviation from my original plan, mainly due to backend data interface bottlenecks.
- However, this deviation hasn’t impacted my current development schedule and is entirely manageable for me.
Today, I will continue working on the development of the ‘Game Mate’ module.
- I’m looking forward to collaborating with the backend team for data interface integration.
- If higher-priority tasks arise, leading to the continued unavailability of the interface, I’m prepared to shift my focus to refining the details of this feature.
One point to note is that if the ‘Game Mate’ related data interface is still not available by tomorrow, it poses a certain risk to my work.
- However, considering the lower priority of this module, I can initially use mock data for frontend functionality testing.
That concludes the updates I needed to share. Thank you all.
Tutorial: Conducting an Effective Work Briefing
Introduction
Good morning, team. In this briefing, we’ll cover two key areas: a recap of last Friday’s activities and our agenda for today.
Recap of Last Week’s Work
- Focus Area: Last Friday was dedicated to the permit list’s restructuring.
- Tasks Accomplished:
- Updated breadcrumbs, page titles, and list headers as per new design guidelines.
- Adjusted the text and sequence within the list.
- Deviation and Management:
- Encountered a slight deviation from the initial plan due to backend data interface delays.
- Despite these challenges, we managed to stay on track with our development timeline.
Today’s Work Plan
- Primary Objective: Continue with the ‘Game Mate’ module development.
- Collaboration Goals:
- Aim to coordinate with the backend team for data interface integration.
- Contingency Plans:
- In case of high-priority tasks or continued interface unavailability, will shift focus to refining feature details.
- Risk Management:
- A potential risk is the delayed availability of ‘Game Mate’ data interface.
- To mitigate, plan to use mock data for initial frontend functionality testing, considering the module’s lower priority.
Conclusion
This briefing encapsulates our immediate work strategies and plans. Ensuring flexibility and adaptability in our approach is key to maintaining our progress. Thank you for your attention and continued dedication.