mysql 定时创建表_MySQL定时创建表的SQL语句

– 查看事件计划

SELECT @@event_scheduler

– 打开事件计划

SET GLOBAL event_scheduler = 1

CREATE PROCEDURE create_table()

BEGIN

declare str_date varchar(16);

SET str_date = date_format(now(),"%Y%m");

SET @sqlcmd1 = CONCAT('CREATE TABLE db_mail_message_',str_date,"(apptaskid varchar(100) NOT NULL,taskname varchar(200) NOT NULL,appsenduid varchar(200) NOT NULL,appreceiveuid varchar(100) NOT NULL,sendtime varchar(50) NOT NULL,handletime varchar(50) NOT NULL,url varchar(500) NOT NULL,remark varchar(500) NOT NULL,endtime varchar(50) NOT NULL,imapuid varchar(100) NOT NULL,addstatus int(1) NOT NULL DEFAULT '0',readstatus int(1) NOT NULL DEFAULT '0',deletestatus int(1) NOT NULL DEFAULT '0',completestatus int(1) NOT NULL DEFAULT '0',PRIMARY KEY (apptaskid),KEY db_imapuid_index (imapuid)) ENGINE=MyISAM DEFAULT CHARSET=utf8;");

PREPARE p1 FROM @sqlcmd1;

EXECUTE p1;

DEALLOCATE PREPARE p1;

END

– 创建事件:每隔一秒自动调用

CREATE EVENT IF NOT EXISTS e_test

ON SCHEDULE EVERY 1 SECOND

ON COMPLETION PRESERVE

DO CALL test();

– 创建事件:每月1号1点自动调用存储过程(未测试)

CREATE EVENT if not exists e_test on schedule every 1 MONTH  STARTS DATE_ADD(DATE_ADD(DATE_SUB(CURDATE(),INTERVAL DAY(CURDATE())-1 DAY), INTERVAL 1 MONTH),INTERVAL 1 HOUR)  on completion preserve do call test();

– 开启事件

alter event e_test ON COMPLETION PRESERVE ENABLE;

– 关闭事件

alter event e_test ON COMPLETION PRESERVE DISABLE;

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值