//保单的”起保日期“
LocalDateTime shipmentDate = order.getShipmentDate();
//当前的时间
LocalDateTime now = LocalDateTime.now();
//当前日期减去起保日期的天数
Duration between = LocalDateTimeUtil.between(shipmentDate, now);
//相差的时间间隔天数为:
long betweenDays = between.toDays();
LocalDateTime类型得两个日期相差得天数如何计算
最新推荐文章于 2024-03-11 16:21:40 发布