【软件工程习题答案】第九章 软件生命周期模型

第九章 单元测试1单选(5分)The waterfall model of the software process is _________.软件过程的瀑布模型是 CA.A good method for quickly constructing executable software product.B.Suitable for the software product which is developed by a large team.C.Suitable to the situatio
摘要由CSDN通过智能技术生成

第九章 单元测试

1单选(5分)
The waterfall model of the software process is _________.
软件过程的瀑布模型是 C
A.A good method for quickly constructing executable software product.
B.Suitable for the software product which is developed by a large team.
C.Suitable to the situation when the requirement is defined explicitly.
D.A model which cannot be used at present.

2单选(5分)
The incremental model of the software process is _____________.
软件过程的增量模型是 B
A.Suitable to the situation when the requirement is defined explicitly.
B.A good method for quickly constructing executable software product.
C.A model which cannot be used at present.
D.Suitable for the software product which is developed by a large team.

3单选(5分)
The biggest disadvantage of waterfall model is that it is difficult to adapt to the change of _________.
瀑布模型的最大缺点是难以适应_________的变化。C<

  • 0
    点赞
  • 2
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值