I. SCRUM section
1. Achievements
Recent Task Description | Members | Links |
---|---|---|
Basic design of the front-end UI of the chat page【4h】 | 汪郑贤【832102222_21124744】 | https://github.com/MochNevin/Wechat |
Front-end UI testing of the basic design chat page【1h】 | 袁成睿【832102223_21126348】 | https://github.com/MochNevin/Wechat |
Modify database design vulnerabilities【2h】 | 陈堃【832102218_21125261】 | https://github.com/MochNevin/WechatServer |
Blog writing【1h】 | 俞宇星【832102222_21125414】 | - |
· UI page: Currently, users can enter messages in the chat box to communicate, as shown in the video under PM report.
· Database Design: We tweaked the code design of some databases.
In this stage, we mainly carried out UI design and some corrections to the past links, and there was no code output. Next Meeting is on December 9.
2. SCRUM meeting
II. PM report
1.
Project | Time |
---|---|
Overall expected tasks for the near-term project | 5 tasks with an estimated total time of 240 hours |
Work completed | 0.5 tasks completed in 72 hours |
Remaining work | 4.5 tasks remaining with an estimated total time of 168 hours |
2.
3. Latest chat interface UI design
Software engineering project chat interface UI design