物资篇:
1、Assigning material components to a Project 给项目分配物料组件
2、material masters 物料主数据
3、inventroy 库存
4、Item category:Stock item(L)Non-Stock item(N) 项目类别:库存(L)无库存(N)
5、reservation 预留 eg:the system generates a reservation 系统生成一个预留
6、purchase requisition 采购申请PR
7、request for quotation 询价
8、Goods receipt 收货
9、Goods issue 发货/领用
The goods issue that take place as a result of this activity reduces the stock and posts actual costs to the consuming network activity.
10、globally 全局地
11、individually 独立地
12、consume 消耗
13、warehouse=plant stock or project/sales order stock 一般库存或者项目/销售订单库存
14、material withdrawal 材料退回
15、CN33 In this process, the system uses common reference points(参考点) that are maintained both components in the BOM and activities for the project.
16、posting 过账
17、document 凭证
18、collective stock 通用库存
19、individual stock 独立库存
20、criteria 标准
21、calculate 计算
22、evaluation,evaluate 评估
23、WIP:work in process 在制品
24、parameter 界限、变量
25、process n步骤 v处理