- 博客(3)
- 资源 (16)
- 收藏
- 关注
转载 Chapter 3 – Top Block
In a normalproject, the development of the DUT is done separately from the development ofthe testbench, so there are two components that connects both of them: The top block of the testbench A v
2015-04-13 11:01:00 896
转载 Chapter 2 – Defining the verification environment
Beforeunderstanding UVM, we need to understand verification. Right now, wehave a DUT and we will have to interact with it in order to test itsfunctionality, so we need to stimulate it. To achieve thi
2015-04-03 15:25:33 1078
转载 Chapter 1 – The DUT
This trainingguide will focus on showing how we can build a basic UVM environment, so thedevice under test was kept very simple in order to emphasize the explanation ofUVM itself. The DUT used isa si
2015-04-01 16:27:45 660
2017年一建《水利水电工程管理与实务》教材电子版.pdf
2017-11-10
PCI_Express_Base_Specification_Revision_4.0
2017-11-10
UVM_1.1_Class_Reference_Final
2015-09-16
uvm-cookbook-sequences-guide-verification-academy
2015-09-16
coverage-cookbook-complete-verification-academy
2015-09-16
空空如也
TA创建的收藏夹 TA关注的收藏夹
TA关注的人