1 Introduction
As a MM consult, I think it is very important as following basic docoment.
2 Detail
material master data (MM01 MM02 MM03)
po (purchase order) (ME21N ME22N ME23N)
pr(purchase requisition)(ME51N ME52N ME53N)
migo(goods receipt purchase order)
po invoice(miro).