Epicor Job Status Maintenance

Job Status Maintenance
Use Job Status Maintenance to view or change the  status of a job.  This program is useful for reviewing the status of several jobs at once. 

Menu Path
Navigate to this program from the Main Menu:

Production Management > Job Management > General Operations > Job Status Maintenance 
Job Status Maintenance - spectragem - 丝碧@翠音.spectragem
 
Use the Job Status Maintenance - List sheet to select all jobs for  specific statuses (for example  Firm and  Released). Using a series of buttons (such as  Firm All, Engineer All and Release All),  you can quickly change the status of the listed jobs. 

Use the Job Status Maintenance - Detail sheet to detail information for the selected job. This includes part, description, revision, quantity,  scheduling, printing and status information. 

Use the Job Status Maintenance -  Assemblies sheet to view assemblies that are associated with the selected job that   have been designated as  Plan As Assembly  items. 
The Plan As Assembly functionality enhances MRP processing by planning lower component manufacturing parts through a direct relationship with the end part. These lower manufacturing parts do not have to be included in the assembly structure. the Plan As Assembly functionality can still account for these demand quantities. It does this by leveraging the multi-level assembly build structure to correctly synchronize demand requirements. 
You can also use its flexibility so that subassembly part quantities can be manufactured to stock or manufactured on a job directly linked to the parent part requirements. Any jobs generated through the Plan As Assembly functionality can be automatically given the firm status through the Auto Job Firm Process. This capability minimizes the impact to standard MRP by using the Pull as Assembly (PAA) logic for creating PAA assemblies, using Auto-Consume stock during the scheduling process, and creating a new process to firm up jobs which breaks off PAA assemblies to separate jobs and creates the material demand links

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/7194627/viewspace-1262506/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/7194627/viewspace-1262506/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值