查metalink解决,在此记录一下metalink真是个好东西,不过,要花钱的 ^_^
On 12.0.6 in Production:
When you are attempting to use the WIP Mass Load program,
the following error occurs.
ERROR
Cannot read value for profile option RPM_CONC_PROCESS_ID in routine &ROUTINE.
STEPS
The issue can be reproduced at will with the following steps:
1. Release the Planned Order from Planning Workbench
2. WIP mass Load program completes with Error message
Cannot read value for profile option RPM_CONC_PROCESS_ID in routine &ROUTINE.
3. No Job is imported in WIP.
BUSINESS IMPACT
The issue has the following business impact:
Due to this issue, you cannot use the WIP Mass Load Program.
Cause
The cause of the issue is invalid / incorrect value of wip_interface_s
The data should not conflicting with the details in the WIP_JOB_SCHEDULE_INTERFACE tab