SAP MRP Made Easy -[1.5]需求类型的决定过程

Determination of the Requirements Type

 

需求类型的决定过程

 

 


      

 

If you have entered a strategy group or an MRP group containing the appropriate strategies in the material master record, you do not have to enter a requirements type in Demand Management. The system determines the valid requirements type with the strategy group from the material master record and proposes this type automatically when creating independent or customer requirements. If the strategy group contains more than one planning strategy, the system proposes the requirements type of the main strategy. If necessary, you can overwrite this proposal using one of the requirements types from the alternative strategies.

 

如果在物料主数据中你已经输入了一个包含正确策略的策略组或MRP组,你就不需要再在需求管理中输入需求类型了。系统从物料主数据中的策略组中获得有效的需求类型,并在创建独立需求或客户需求时自动建议。如果策略组包含多个计划策略,系统建议使用主策略的需求类型,你也可应使用替代策略来覆盖已建议的策略。

 

 

 

The following strategy groups combine two planning strategies:

 

以下策略组包含两个计划策略:

 

Strategy 31 策略 31

 

Allows you to select the Make-to-Order Production (20) or Production by Lot-size (30) strategies by selecting the KE or KL requirements types [strategy 20 (KE) is the default]

 

允许你选择按单生产(20)或按批量生产(30)策略,需求类型是KE或KL  [策略20(KE)是缺省的]。

 

 

 

Strategy 32  策略 32

 

 

 

Allows you to select the Production by Lot-size (30) or Make-to-Order Production (20) strategies by selecting the KL or KE requirements types [strategy 30 (KL) is the default]

 

允许你选择按批量生产(30)或按单生产(20)策略,需求类型是KL或KE  [策略30(KL)是缺省的]。

 

 

 

Strategy 33  策略 33

 

 

 

Allows you to select the Production by Lot-size (30) or Planning with Final Assembly (40) strategies by selecting the KL or KSV requirements types [strategy 30 (KL) is the default]

 

允许你选择按批量生产(30)或带最终组装的生产(40)策略,需求类型是KL或KSV [策略30(KL)是缺省的]

 

 

 

 

 

Table of Planning Strategy Assignments

 

计划策略分配表

 

 

 

Strategy

 

策略


 Requirements Type for Independent Requirements

 

独立需求的需求类型


  Requirements Type for Customer Requirements

 

客户需求的需求类型


 
 

 

10

 

(Chapter 2)


  

 

LSF


  

 

Make-to-stock production

 

按库存生产


  

 

KSL


  

 

Sale from stock without independent requirement reduction

 

从库存销售,不消耗独立需求


 
 

 

11

 

(Chapter 2)


  

 

BSF


  

 

Gross planned independent requirements

 

毛计划独立需求


  

 

KSL


  

 

Sale from stock without independent requirement reduction

 

从库存销售,不消耗独立需求


 
20 (Chapter 4


  


  


  

 

KE


  

 

Individual sales order without consumption

 

不作消耗的个别销售订单


 
 

 

25

 

(Chapter 5)


  


  


  

 

KEK


  

 

Make-to-order with configurable material

 

使用可配置物料的按单生产


 
 

 

26

 

(Chapter 5)


  


  


  

 

KEL


  

 

Make-to-order for material variants

 

为变式物料作按单生产


 
 

 

30

 

(Chapter 2)


  

 

LSF


  

 

Make-to-stock production

 

按库存生产


  

 

KL


  

 

Sales order manufactured by lot size

 

按批量的销售订单制造


 
 

 

40

 

(Chapter 2)


  

 

VSF


  

 

Planning with final assembly

 

带最终装配的计划


  

 

KSV


  

 

Sales order with consumption

 

销售订单消耗


 
 

 

50

 

(Chapter 4)


  

 

VSE


  

 

Planning without final assembly

 

无最终装配的计划


  

 

KEV


  

 

Make-to-order with consumption

 

带消耗的按单生产


 
 

 

52

 

(Chapter 2)


  

 

VSE


  

 

Planning without final assembly

 

无最终装配的计划


  

 

KSVS


  

 

Make-to-stock with consumption without final assembly

 

带消耗的对库存生产无最终装配


 
 

 

54

 

(Chapter 5)


  

 

VSE


  

 

Planning without final assembly

 

无最终装配的计划


  

 

KEKT


  

 

Make-to-order with consumption of variant

 

带变式消耗的按单生产


 
 

 

55

 

(Chapter 5)


  

 

VSE


  

 

Planning without final assembly

 

无最终装配的计划


  

 

KELV


  

 

Make-to-order variant with consumption

 

带消耗的变式按单生产


 
Strategy

 

策略


 Requirements Type for Independent Requirements

 

独立需求的需求类型


  Requirements Type for Customer Requirements

 

客户需求的需求类型


 
 

 

56

 

(Chapter 5)


  

 

VSE


  

 

Planning without final assembly

 

无最终装配的计划


  

 

KEKS


  

 

Make-to-order with consumption of characteristics planning

 

带特性计划消耗的按单生产


 
 

 

59

 

(Chapter 3)


  

 

VSEB


  

 

Planning; phantom assemblies

 

计划:虚拟组装  


  


  


 
 

 

60

 

(Chapter 4)


  

 

VSEV


  

 

Planning the planning material

 

计划计划物料


  

 

KEVV


 Individual customer with planning material consumption

 

带计划物料消耗的个别客户


 
 

 

63

 

(Chapter 2)


  

 

VSEV


  

 

Planning the planning material

 

计划计划物料


  

 

KSVV


 Make-to-stock with consumption of planning material

 

带计划物料消耗的按库存生产


 
 

 

65

 

(Chapter 5)


  

 

VSEV


  

 

Planning the planning material

 

计划计划物料


  

 

ELVV


  

 

Make-to-order variant with planning material

 

带计划物料的变式按库存生产


 
 

 

70

 

(Chapter 3)


  

 

VSFB


  

 

Planning for assemblies

 

为组装计划


  


  


 
 

 

81

 

(Chapter 6)


  


  


  

 

KMSE


  

 

Assembly planned order

 

计划订单组装


 
 

 

82

 

(Chapter 6)


  


  


  

 

KMFA


  

 

Assembly with production order

 

生产订单组装


 
 

 

89

 

(Chapter 5)


  

 

VSE


  

 

Planning for assemblies

 

为组装计划


  

 

KMSE


  

 

Assembly planned order

 

计划订单组装


 

 

 

 

 

The following planning strategies are used in the Project System (refer to the Project System documentation for more details):

 

以下计划策略使用在项目系统中(参考项目系统文档可以获得根多的信息):

 

 

 

Strategy 21  Similar to 20 with project settlement.

 

策略21       和20相似,使用项目结算。

 

Strategy 51  Similar to 50 with project settlement.

 

策略51       和50相似,使用项目结算。

 

 

 

Strategy 61  Similar to 60 with project settlement.

 

策略61       和60相似,使用项目结算。

 

Strategy 83  Assembly processing for PS.

 

策略83       为PS项目系统的组装处理。

 

 

 

Strategy 85  Assembly processing for PS.

 

策略85       为PS项目系统的组装处理。

 

 

 

The following planning strategy is used in Service Management (refer to the Service Management documentation for more details):

 

以下计划策略用在服务管理中(参考服务管理文档获得更多的信息):

 

 

 

Strategy 84   Assembly processing for SM

 

策略84        为SM服务管理的组装处理

 

The following planning strategy is used in PP-PI [(Production Planning for Process Industy) refer to the PP-PI documentation for more details]:

 

以下计划策略用在流程行业的生产计划[(Production planning for Process Industy)参考PP-PI文档会获得更多的信息]:

 

Strategy 86 Assembly processing for PP-PI

 

策略86        为PP-PI的组装处理

 

整齐版请参见CSDN博客版,转载请标明出处:http://blog.csdn.net/baiboyd/archive/2009/06/15/4269586.aspx

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/451283/viewspace-606487/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/451283/viewspace-606487/

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值