Purpose:
理清R3里的firm type,与APO里的SNP production horizon、ST horizon等的关系。
Approach:
MRP Type P1 - > Change to X0 in ECC - > Via CIF Enhancement , map the Planning time fence ( from ECC) to SNP Prod Horizon/ SNP Stock transfer horizon ( depending on Proc. type) & Auto select the Indicator "Fix Production" or "Fix Stock Transfers" in APO depending on Proc. Type
MRP Type P3 -> Change to X0 in ECC -> Via CIF Enhancement , map the Planning time fence ( from ECC) to SNP Prod Horizon/ SNP Stock transfer horizon ( depending on Proc. type) & Do Not Select Indicators "Fix Production" or "Fix Stock Transfers" in APO
MRP Type PD --> Change to X0 in ECC -> Do not map Planning time fence / do not select the "Fix Production" or "Fix Stock transfers" indicators.
Case1 - SNP production horizon, with no "fix"
R3 MD04
APO
SNP production horizon:
Now Heu.
==> we can see: it fulfill the shortage in SNP production horizon at the end of period. And not fixed ==> like firm type "3".
Case2 - SNP production horizon, with "fix"
Master data
Run Heu.
==> noted: this indicator only controls the historical PL order within horizon.