The PR and external purchasing documents(POs,contracts,scheduling agreements and RFQs) can be set with release procedure.
[@more@]For PR, there are two type of procudure.
1. release without classification
PR can only be released at item level. Only account assignment category,material group,plant and value characteristics are available as release criteria.
2. release with classification
characteristics->class->release group->release code
release group->release strategy
1)create characteristics and class, assign characteristics to class.
2)create release group
3)create release code
4)create release indicators
5)create release strategy
6)defining a workflow(option)
**the maxinum number of release codes in a release strategy is 8.
来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/81815/viewspace-1023406/,如需转载,请注明出处,否则将追究法律责任。
转载于:http://blog.itpub.net/81815/viewspace-1023406/