flow job

 
Backorders are not generated for flow schedules because all the components have to be available for flow schedules otherwise no move orders are generated.
For the flow job, we need to pick all the component together(may be one seq ).
If we need to back order, we need to back order all the component together.(one seq )
After the component back ordered, we need update APPS.WIP_FLOW_SCHEDULES  allocated_flag = null, then the flow job can be re-pick
 

FAQ Oracle Flow Manufacturing Application For Setup, Sequencing, Workbench, Mix Model Map [ID 396177.1]

 

Key Facts for Flow Manufacturing in Connection to the Component Pick Release [ID 1354888.1]

 

来自 “ ITPUB博客 ” ,链接:http://blog.itpub.net/15225049/viewspace-718368/,如需转载,请注明出处,否则将追究法律责任。

转载于:http://blog.itpub.net/15225049/viewspace-718368/

评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值