Today is Wednesday, August 22th, the weather is not better, it was raining in the morning. But when I went out home, the rain stopped, it is so lucky for me!
My work was outfield testing by myself, now I will told about something before you go out for outfield testing!
There are a lot of things should be prepared, As follows:
1.Computer: In my opinion, this is so important for a tester. it should be has a long standby time, about two hours.
2.TD316 machine,which can catch logs by serial ports.So The software engineer can slove the BUG with the logs' message.
3.SIM card,It can be used.We should test it by "ping www.sina.com.cn -t".
Also, we should install a lot of useful software,such as ACAT、DM、SSCOM、XunLei、UE and so on.