成本滚算层级-Phantom Item Cost Is Not Rolling Up At End Item Cost (文档 ID 1184492.1)

摘自:https://support.oracle.com/epmos/faces/DocumentDisplay?_afrLoop=175601123787976&id=1184492.1&_adf.ctrl-state=j43v3z73c_52

 

Phantom Item Cost Is Not Rolling Up At End Item Cost (文档 ID 1184492.1)转到底部转到底部

In this Document

 Symptoms
 Cause
 Solution
 References

 

APPLIES TO:

Oracle Cost Management - Version 12.1.1 and later
Information in this document applies to any platform.

SYMPTOMS


On : 12.1.1 version, Miscellaneous

When attempting to roll up Item cost, the following error occurs.

ERROR
-----------------------

An invalid account is associated with the item being transacted.
failure:Ele_Acct( 110 ): An invalid account is associated with the item being transacted.




STEPS
-----------------------
The issue can be reproduced at will with the following steps:
1. Responsibility: Cost Management
2. Supply Chain Costing
3. Supply Chain Cost Rollup
4. Supply Chain Cost Rollup - Print Report

CAUSE



The customer is missing Patch 7271694 in their 11.5.10 instance.

The following justifies how the issue is related to this specific customer:
The functionality is correct. It has been the right and designed system
behavior for a long time.
.
Note phantom is a special sub-assembly and its routing cost is directly
exploded under the final assembly as this-level cost. If you have a
lot-based resource under a phantom, it should inherit the final assembly's
lot size in calculating its contribution to the final assembly's cost. The
phantom's lot size and phantom's quantity should not have an effect on a lot
resource's cost to the final assembly.

This is explained in the following bug:
Bug 10014225 - PHANTOM ITEM COST IS NOT ROLLING UP AT END ITEM COST

SOLUTION

The functionality is correct. It has been the right and designed system behavior for a long time.
.
Note:

Phantom is a special sub-assembly and its routing cost is directly exploded under the final assembly as this-level cost. If you have a lot-based resource under a phantom, it should inherit the final assembly's
lot size in calculating its contribution to the final assembly's cost. The phantom's lot size and phantom's quantity should not have an effect on a lot resource's cost to the final assembly. The following example illustrates the
design logic:
.
ass_1 (Final Assembly), Lot Size: 30, Resource Used: 10Hr @$10/Hr
ass_2 (Phantom Sub Assembly), Lot Size: 20, Resource Used: 10Hr @$10/Hr
ass_3 (Phantom Sub Assembly), Lot Size: 10, Resource Used: 10Hr @$10/Hr
.
Lets say the BOM looks like:
ass_1 --> 5(ass_2)
ass_2 --> 5(ass_3)
.
The correct resource cost at the final level(ass_1) should be:
ass_1: $100.00/30 + 100/30.00 + 100/30.00 = 10.00
.
In the customer's example, your phantom's lot size is 5000, so the lot-based
resource cost for the phantom itself is:
3.60*24.67/5000=0.01776
.
However, the final assembly's lot size is 1, so the lot-based resource cost
for the final assembly should be converted back to (note a component yield of
0.98):
0.01776*5000/0.98=90.61224
.
If you meant to achieve the same result of this lot-based resource for the
final assembly as the phantom, you should set the final assembly's lot size
to be the same as 5000 instead of 1.
.
The functionality is that for a lot-based resource under a phantom, it should inherit the final assembly's lot size in calculating its contribution to the final assembly's cost.

 

REFERENCES

BUG:10014225 - PHANTOM ITEM COST IS NOT ROLLING UP AT END ITEM COST
NOTE:429153.1 - Material Transactions with Error CSTPLCIN.COST_INV_TXN An Invalid Account Is Associated With The Item Being Transacted
  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值