hdu 3433 A Task Process N个人,第i个人完成一个A任务需要时间ai,完成一个B任务需要时间bi, 现在又X个任务A和Y个任务B,求完成所有任务所需要的最短时间。

Problem DescriptionThere are two kinds of tasks, namely A and B. There are N workers and the i-th worker would like to finish one task A
摘要由CSDN通过智能技术生成

Problem Description
There are two kinds of tasks, namely A and B. There are N workers and the i-th worker would like to finish one task A in ai minutes, one task B in bi minutes. Now you have X task A and Y task B, you want to assign each worker some tasks and finish all the tasks as soon as possible. You should note that the workers are working simultaneously.
 

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值