SAP PP Function Capability Management

Production EngineeringProduction BOM ManagementHighBill of Materiala. Single/Multiple Level BOMs
b. BOM Categories/Usage/Structure/Plant Allocation/Alternative BOMs/Item Categories
c. Configurable BOMs
PLM114 Basic Data for Manufacturing and Product Management
HighOrder BOMsa. Sales Order
b. Variant BOMs
c. Order BOM Cost Estimate
SCM310 Production Orders
Recipe/Routing ManagementHighRoutingsa. Task List
b. Routings/Rate Routings
c. Routing Sequence/Operations/Material Components/PRTs/Trigger Points/Sceduling/Consistency Check/QM Data
d. Configurable Routings
PLM114 Basic Data for Manufacturing and Product Management
MediumMaster Recipesa. Recipe Structure/Operation and Phase Data/Material Data/Resource Data/QM Data/Process Control Data/Scheduling/Consistency Check
b. Configurable Master Recipe
PLM115 Basic Data for Process Manufacturing
LowProduction Resources/Toolsa. Material/Document/Equipment/Other PRT
b. Assignment of PRTs to Operations
PLM114 Basic Data for Manufacturing and Product Management
Basic DataHighWork Centersa. Standard Value/Default Values/Control Keys
b. Capacities/Scheduling Data/Costing Data
c. Formulas
PLM114 Basic Data for Manufacturing and Product Management
Production VersionHighProduction Versiona. Lot Size/Validadity/Consistency Checks
b. Repetitive Manufaturing
PLM114 Basic Data for Manufacturing and Product Management

Production PlanningSales & Operations PlanningLowSales & Operations Planninga. Product Group/Planning Hierarchy
b. Planning Type/Planning Table
c. Rough-cut Planning Profile/Resource Leveling
SCM100 Planning Overview(ERP)
SCM130 Planning and Manufacturing Overview
Distribution Resource PlanningLowDistribution Resource Planninga. Distribution Network
b. Running DRP
c. Running Deployment
SCM100 Planning Overview(ERP)
SCM130 Planning and Manufacturing Overview
Master PlanningHighDemand Managementa. Planning Strategies for MTS/MTO/Planning Components/Configuration Materials
b. Requirement Type/Consumption Stratiges
c. Determining and Assigning the Planning Strategies
d. Cross-Plant Planning/Availibity Check
e. Planned Independent Requirements(PIRs)
f. Customer Requirements
SCM240 Production Planning(ERP)
MediumLong-Term Planninga. Planning Scenarios
b. Running MRP/Evaluating Long-Term Planning
SCM240 Production Planning(ERP)
Capacity PlanningHighCapacity Planninga. Available Capacity/Capacity Requirement
b. Scheduling
c. Capacity Evaluation/Capacity Leveling
SCM360 Capacity Planning
Material Requirements PlanningHighMaterial Requirements Planninga. MRP Type/Safety Stock
b. MPS/MRP
c. Net Requirement Calculation
d. Lot Sizing/Rounding
e. Scheduling for In-House Production and External Procurement/Procurement Proposal
f. BOM Explosion/Dependent Requirements
g. Exception Message/Ranges of Coverage
h. Subcontracting/MRP Area/Cross-Plant Planning
i. Running MRP/MRP Live
j. MRP List/Stock Requirement List
SCM240 Production Planning(ERP)

Production OperatiopnsDiscrete Manufacturing HighProduction Ordersa. Order Creation/Change/Display/Planned Order Conversion
b. Routing Selection/BOM Selection/Reading Master Data
c. Scheduling
d. Components/Backflush/Batch Determination
e. Trigger Points/Availability Check
f. Preliminary Costing/Cost Elements/Material Cost/Production Cost
g. Order Release/Status
h. Inspection Lots/Missing Parts
i. Printing Shop Papers
j. Goods Movements/Withdrawing Components/Picking/Stock Determination/Material Staging/Goods Receipt
k. Confirmations/Goods Movements for Confirmations/Cacelling/Reprocessing
SCM300 Manufacturing Overview
SCM310 Production Orders
Process ManufaturingMediumProcess Ordersa. Order Creation/Change/Display/Planned Order Conversion
b. Scheduling
c. Components/Availability Check
e. Preliminary Costing/Cost Elements/Material Cost/Production Cost
f. Order Release/Status
g. Inspection Lots/Missing Parts
h. Printing Shop Papers
i. Goods Movements/Withdrawing Components/Picking/Stock Determination/Material Staging/Goods Receipt
j. Confirmations/Goods Movements for Confirmations/Cacelling/Reprocessing
SCM300 Manufactuing Overview
SCM340 Process Orders
MediumProcess Managementa. Process Message/Process Message Category/Process Message Destination/Process Message Evaluation
b. Process Instructions/Process Instruction Category/Process Instruction Type/Process Instruction Sheets
c. Control Recipes/Control Recipe Destinations/Control Recipe Status
SCM300 Manufacturing Overview
SCM340 Process Orders
KanbanMediumKanbana. Classic Kanban/Event-driven Kanban
b. Production Supply Area/Kanban Control Cycle.
c. Kanban Status/Signal/Kanban Board/Error Handling/Kanban Cards
d. Replenishment Strategies for In-House Production/External Procurement/Stock Transfer
SCM300 Manufacturing Overview
SCM320 Repetitive Manufacturing
Repetitiuve ManufacturingHighRepetitiuve Manufacturinga. MTS Repetitive Manufacturing/MTO Repetitive Manufacturing
b. Repetitive Manufacturing Profile/Production Version/Planning ID/Production Line/Rate Routing/Product Cost Collector
c. Standard Cost Estimates/Preliminary Costing for Product Cost Collectors
d. Planning Table/Sequencing
e. Pull List/Material List
f. Confirmation/Backflush/Quality Inspection
SCM300 Manufacturing Overview
SCM320 Repetitive Manufacturing

Extended Production Planning and SchedulingProduction Planning and Detailed SchedulingMediumIntegrateing PP/DSa. CIF
b. PP Planning Procedures/Planning Versions
c. Product/Location/Resource/Transportation Lane/Quota Arrangement
d. Safety Time/Setup Matrix/Setup Group
e. External Producrement Relationship/Sales Scheduling Agreement
SCM200 Business Processes in Planning
SCM210 Core Interface APO
SCM212 SAP SCM Integrated Supply Chain Modeling
SCM215 Integrated Master Data in SAP SCM
Production Planninga. Net Requirements Calculation
b. Lot-Size Calculation
c. Source Determination
d. PPM/PDS Explosion and Scheduling
e. Pegging
f. Setup Matrix/Setup Group
g. Product Planning View/Capacity Planning View
h. Day's Supplies/Alert Management
SCM200 Business Processes in Planning
SCM250 Production Planning and Detailed Scheduling(SAP APO PP/DS)
  • 0
    点赞
  • 1
    收藏
    觉得还不错? 一键收藏
  • 打赏
    打赏
  • 0
    评论

“相关推荐”对你有帮助么?

  • 非常没帮助
  • 没帮助
  • 一般
  • 有帮助
  • 非常有帮助
提交
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包

打赏作者

SAP_Damon

你的鼓励将是我创作的最大动力

¥1 ¥2 ¥4 ¥6 ¥10 ¥20
扫码支付:¥1
获取中
扫码支付

您的余额不足,请更换扫码支付或充值

打赏作者

实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值