Production Engineering | Production BOM Management | High | Bill of Material | a. Single/Multiple Level BOMs b. BOM Categories/Usage/Structure/Plant Allocation/Alternative BOMs/Item Categories c. Configurable BOMs | PLM114 Basic Data for Manufacturing and Product Management |
High | Order BOMs | a. Sales Order b. Variant BOMs c. Order BOM Cost Estimate | SCM310 Production Orders | ||
Recipe/Routing Management | High | Routings | a. Task List b. Routings/Rate Routings c. Routing Sequence/Operations/Material Components/PRTs/Trigger Points/Sceduling/Consistency Check/QM Data d. Configurable Routings | PLM114 Basic Data for Manufacturing and Product Management | |
Medium | Master Recipes | a. Recipe Structure/Operation and Phase Data/Material Data/Resource Data/QM Data/Process Control Data/Scheduling/Consistency Check b. Configurable Master Recipe | PLM115 Basic Data for Process Manufacturing | ||
Low | Production Resources/Tools | a. Material/Document/Equipment/Other PRT b. Assignment of PRTs to Operations | PLM114 Basic Data for Manufacturing and Product Management | ||
Basic Data | High | Work Centers | a. Standard Value/Default Values/Control Keys b. Capacities/Scheduling Data/Costing Data c. Formulas | PLM114 Basic Data for Manufacturing and Product Management | |
Production Version | High | Production Version | a. Lot Size/Validadity/Consistency Checks b. Repetitive Manufaturing | PLM114 Basic Data for Manufacturing and Product Management |
Production Planning | Sales & Operations Planning | Low | Sales & Operations Planning | a. Product Group/Planning Hierarchy b. Planning Type/Planning Table c. Rough-cut Planning Profile/Resource Leveling | SCM100 Planning Overview(ERP) SCM130 Planning and Manufacturing Overview |
Distribution Resource Planning | Low | Distribution Resource Planning | a. Distribution Network b. Running DRP c. Running Deployment | SCM100 Planning Overview(ERP) SCM130 Planning and Manufacturing Overview | |
Master Planning | High | Demand Management | a. Planning Strategies for MTS/MTO/Planning Components/Configuration Materials b. Requirement Type/Consumption Stratiges c. Determining and Assigning the Planning Strategies d. Cross-Plant Planning/Availibity Check e. Planned Independent Requirements(PIRs) f. Customer Requirements | SCM240 Production Planning(ERP) | |
Medium | Long-Term Planning | a. Planning Scenarios b. Running MRP/Evaluating Long-Term Planning | SCM240 Production Planning(ERP) | ||
Capacity Planning | High | Capacity Planning | a. Available Capacity/Capacity Requirement b. Scheduling c. Capacity Evaluation/Capacity Leveling | SCM360 Capacity Planning | |
Material Requirements Planning | High | Material Requirements Planning | a. MRP Type/Safety Stock b. MPS/MRP c. Net Requirement Calculation d. Lot Sizing/Rounding e. Scheduling for In-House Production and External Procurement/Procurement Proposal f. BOM Explosion/Dependent Requirements g. Exception Message/Ranges of Coverage h. Subcontracting/MRP Area/Cross-Plant Planning i. Running MRP/MRP Live j. MRP List/Stock Requirement List | SCM240 Production Planning(ERP) |
Production Operatiopns | Discrete Manufacturing | High | Production Orders | a. Order Creation/Change/Display/Planned Order Conversion b. Routing Selection/BOM Selection/Reading Master Data c. Scheduling d. Components/Backflush/Batch Determination e. Trigger Points/Availability Check f. Preliminary Costing/Cost Elements/Material Cost/Production Cost g. Order Release/Status h. Inspection Lots/Missing Parts i. Printing Shop Papers j. Goods Movements/Withdrawing Components/Picking/Stock Determination/Material Staging/Goods Receipt k. Confirmations/Goods Movements for Confirmations/Cacelling/Reprocessing | SCM300 Manufacturing Overview SCM310 Production Orders |
Process Manufaturing | Medium | Process Orders | a. Order Creation/Change/Display/Planned Order Conversion b. Scheduling c. Components/Availability Check e. Preliminary Costing/Cost Elements/Material Cost/Production Cost f. Order Release/Status g. Inspection Lots/Missing Parts h. Printing Shop Papers i. Goods Movements/Withdrawing Components/Picking/Stock Determination/Material Staging/Goods Receipt j. Confirmations/Goods Movements for Confirmations/Cacelling/Reprocessing | SCM300 Manufactuing Overview SCM340 Process Orders | |
Medium | Process Management | a. Process Message/Process Message Category/Process Message Destination/Process Message Evaluation b. Process Instructions/Process Instruction Category/Process Instruction Type/Process Instruction Sheets c. Control Recipes/Control Recipe Destinations/Control Recipe Status | SCM300 Manufacturing Overview SCM340 Process Orders | ||
Kanban | Medium | Kanban | a. Classic Kanban/Event-driven Kanban b. Production Supply Area/Kanban Control Cycle. c. Kanban Status/Signal/Kanban Board/Error Handling/Kanban Cards d. Replenishment Strategies for In-House Production/External Procurement/Stock Transfer | SCM300 Manufacturing Overview SCM320 Repetitive Manufacturing | |
Repetitiuve Manufacturing | High | Repetitiuve Manufacturing | a. MTS Repetitive Manufacturing/MTO Repetitive Manufacturing b. Repetitive Manufacturing Profile/Production Version/Planning ID/Production Line/Rate Routing/Product Cost Collector c. Standard Cost Estimates/Preliminary Costing for Product Cost Collectors d. Planning Table/Sequencing e. Pull List/Material List f. Confirmation/Backflush/Quality Inspection | SCM300 Manufacturing Overview SCM320 Repetitive Manufacturing |
Extended Production Planning and Scheduling | Production Planning and Detailed Scheduling | Medium | Integrateing PP/DS | a. CIF b. PP Planning Procedures/Planning Versions c. Product/Location/Resource/Transportation Lane/Quota Arrangement d. Safety Time/Setup Matrix/Setup Group e. External Producrement Relationship/Sales Scheduling Agreement | SCM200 Business Processes in Planning SCM210 Core Interface APO SCM212 SAP SCM Integrated Supply Chain Modeling SCM215 Integrated Master Data in SAP SCM |
Production Planning | a. Net Requirements Calculation b. Lot-Size Calculation c. Source Determination d. PPM/PDS Explosion and Scheduling e. Pegging f. Setup Matrix/Setup Group g. Product Planning View/Capacity Planning View h. Day's Supplies/Alert Management | SCM200 Business Processes in Planning SCM250 Production Planning and Detailed Scheduling(SAP APO PP/DS) |