KS-ProjectPlanner Pro 2022 甘特图资源项目管理软件

KS-ProjectPlanner Pro 2022 | Projektmanagement Software for MS Windows Desktop

In the first releases, KS-ProjectPlanner was published as a freeware. There have been many downloads and user requests for more features. Many of the requested features are now realized in the Pro Version.

The program has also become much more powerful. Where the freeware version could handle hundreds of tasks fluently, the Pro version can do it with thousands. This was achieved by many optimizations and the implementation of sophisticated data structures. Some core calculations have been speeded up by the factor of one hundred.

应用信息

当使用一个好的软件时,项目管理可以是真正有趣的,除了使用这样的软件可以获得巨大的好处。KS-ProjectPlanner Pro 2022通过双击添加新任务比将它们输入到日历或电子表格应用程序中更直观和更流畅。

您还可以指定对其他任务的约束和依赖关系,并定义资源的可用性和成本。对于每一个更改,软件都会立即给您反馈,并显示对项目计划的影响。项目和成本总是在你的完全控制之下。所有这些都非常有用,你不应该放弃。

Project management can be real fun, when using a good software,

.. once apart from the enormous benefits that you will gain by using such a software. Adding new tasks by double-click is more intuitive and smoother than typing them into a calendar or spreadsheed application. You can also specify constraints and dependencies to other tasks and define the availability and cost of resources. With every change, the software gives you immediate feedback and shows the impact on the project plan. You'll always have the project and the costs under full control. And all this is so incredibly useful, that you shouldn't renounce.

Dynamic Planning

by the quick and fluid work flow of this program.

Full cost control

prevents your project from running out of the rudder.

Pathbreaking on Tracking

Once your project is running, the program takes account of status and progression of tasks.

Working in a team

Projects can be optionally managed on a SQL Server.

INTRODUCTION

The Art of Project Planning

When an artist paints a picture, he starts with a big brush and puts the gross forms. In the following steps, he refines the painting and goes more and more into the details, until he finally puts the finishing highlights with a fine hair brush. So he works from coarse to fine.

This is the way how you should also proceed in project planning:
From coarse to fine.

Planning

Start with a long task bar that extends over the entire project duration. Then right-click->Break down.. to subdivide this into finer tasks. Again break these tasks down to more detailed tasks, etc. This way you can create even a large projects quite quickly in it’s basic structure. Rename the newly created tasks and groups directly in the data-table.

With this basic structure, the program has also added dependencies all around with the tasks. Check these and add more dependencies where required.

Now you can begin to set the estimated duration for all tasks, by dragging them at their right border with the mouse. You can use the ASAP function from the main menu to align all tasks (or just the selected) to the left, which is as soon as possible.

Add some milestones to the project, which act like stage wins in a bicycle race, and make following tasks to depend on them. You can fix those milestones by setting their earliest and latest start date in the task dialog (double click to open). This way you can bind the entire project flow to these corner posts, without fixing all other tasks.

Also think, which tasks could run independently in parallel (at the same time). In the ideal case you’ll have planned some continuous strings from project start to it’s end. You should also add two more milestones at the project’s start and end. You shouldn’t fix the project end, unless it’s not a deadline, which must never be exceeded.

Now you can start assigning resources to all tasks, except for the milestones.

Tracking

Until now you have been in the planning stage. But in the moment, when you set the first task into ‘running’ state, the entire project definitely has begun and is now in tracking mode.

The program reports this important step and add’s a first project baseline, which is a current snap shot, and which can later be compared with the actual flow. You can add more baselines at any time.

Being the project manager, it’s your job to adjust all tasks and make them fit with reality. Some tasks may last longer than they were planned. Follow up tasks will shift forward automatically, due to their dependencies, and you can see the impact on the project plan and it’s costs immediately.

Now you can’t no longer move any tasks that already have begun, as you did during planning. They will instead start to split at their current point of progress. Tasks which are completed or cancelled can’t be moved at all, because they have to stay at their position to keep records of their performed work and costs.

Critical paths are marked in red. You should keep an eye on them, because a delay on the critical path will affect the total project length. Other paths that run in parallel, may be less critical.

The way how you meet the milestones at their planned date can be a measurement for your success. But you shouldn’t plan the project too tight, and rather add some buffers, so that you finally have some breath for sudden incidents.

Celebrate your success as the project manager together with the team and the customer. A typical milestone in the building craft is a roofing ceremony.

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值