SDLC (System Develop Life Cycle)

CC->ZBB->RTO->RTW->RDC->(RTM)

 

BVT

Build Verification Test.  Automated test run by Test team to maintain baseline functionality for each build.

CC

Code Complete.  All development work for the milestone completed, unit tested, code reviewed and BVT cases successfully run.

ZBB

Zero Bug Bounce.  All bugs resolved within 48 hours

RC

Release Candidate.  Build candidate for final release.

RTO

Release To Operations.  Build has been released to the operations team for deployment.

RTW

Release To Web/World.  Operations team has deployed the release into the production cluster.

RDC

Release Declared Complete.  Operations team has signed-off on the stability of the release and rollback is no longer possible.

RTM

Release to Manufacturing.

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值