四川大学计算机学院软件工程期末,2015四川大学软件工程期末复习

d.Software processes must adapt to changes

incrementally

e.Both c and d

Answer: e

1.To construct a system model the engineer should consider

which of the following restraining factors? Answer: e

a.assumptions

b.budget

c.constraints

d. schedule

e.both a and c

2.During business process engineering, three different

architectures are examined. Answer: a

a.applications, data, technology infrastructure

http://www.360docs.net/doc/f56159a33169a4517723a3c2.htmlmunications, organization, financial

infrastructure

http://www.360docs.net/doc/f56159a33169a4517723a3c2.htmlwork, database, reporting structure

d.systems, requirements, data structure

3.Which of the following is not one of the context-free

questions that would be used during project inception?

a.What will be the economic benefit from a good

solution?

b.Who is against this project?

c.Who will pay for the work?

d.Who will use the solution?

Answer: b

1.During the process of modeling the system in context,

systems that interact with the target system are not represented

as Answer: d

a.Peer-level systems

b.Subordinate systems

c.Super-ordinate systems

d.Working systems

6. In transaction mapping the first level factoring results in the Answer: b

a.creation of CFD.

b.derivation of control hierarchy

c.distribution of work modules

d.refinement of the module view

  • 0
    点赞
  • 0
    收藏
    觉得还不错? 一键收藏
  • 0
    评论
评论
添加红包

请填写红包祝福语或标题

红包个数最小为10个

红包金额最低5元

当前余额3.43前往充值 >
需支付:10.00
成就一亿技术人!
领取后你会自动成为博主和红包主的粉丝 规则
hope_wisdom
发出的红包
实付
使用余额支付
点击重新获取
扫码支付
钱包余额 0

抵扣说明:

1.余额是钱包充值的虚拟货币,按照1:1的比例进行支付金额的抵扣。
2.余额无法直接购买下载,可以购买VIP、付费专栏及课程。

余额充值